This Method Statement describes the hse management arrangements and systems of work to be adopted by Company during civil engineering and Infrastructure groundwork operations. The document, with its appended risk assessment, will suffice for the majority of works undertaken by the company but will require alterations or additions for certainContinue Reading

reinforcement bar method statement

1.0 PURPOSE To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0 SCOPE This method statement outlines the proceduresContinue Reading

air conditioning installation unit

TABLE OF CONTENTS 1.0 INTRODUCTION 2.0 PURPOSE 3.0 DEFINITIONS AND ABBREVIATIONS 4.0 SCOPE OF WORK 5.0 TOOLS and Equipment 6.0 MATERIAL HANDLING 7.0 SITE PLANNING AND PREPARATION 7.1 ACCESS ROUTES & STORAGE SPACE 7.2 WORKING AT HEIGHT 8.0 RESPONSIBILITIES 8.1 PROJECT MANAGER 8.2 PROJECT ENGINEER 8.3 SUPERVISOR / FOREMAN 8.4Continue Reading

Table of Contents 1.0      Introduction 2.0      Purpose and Scope 3.0      Document Control 4.0      Reference Documents 5.0      Definitions, Terms and Abbreviations 6.0      Responsibility 7.0      Materials and Equipment 8.0      Resources 9.0      Methodology / Procedure 10.0    Permit 11.0    Quality Control 12.0    Health, Safety and Environment 1. Introduction A temporary Jetty shall be builtContinue Reading

Structural Steel Work Designs

This article covers the design of connections and the fabrication, supply and erection of structural steel work, roofing system, wall cladding and steel decking. Below is a list of applicable standards and codes: BS 7668:1994, BS EN 10113, BS EN 10155, BS EN 10210; grade 43C: Structural Steel including sections facricated fromContinue Reading