2023
Sep
12

Method Statement for Drainage & Sewage Works

Method Statement for Drainage & Sewage Works

The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications 0considering safety and

2023
Aug
22

Roadworks Road Construction Method Statement

Roadworks Road Construction Method Statement

Below work method statement outlines the steps to apply and lay pavement for the road construction consisting sub-base of granular material, road base of crusher run, asphaltic concrete binder course and asphaltic concrete wearing course. Method statement shall apply for all roadworks

2023
Jul
15

Construction Noise Control Measures, Plan and Procedure

Construction Noise Control Measures, Plan and Procedure

This health and safety instruction provides information on the noise hazards and control measures regarding noise in the workplace with the view to prevent industrial hearing loss. The safety procedure is applicable for all kind of projects. Additional control measures may be

2023
Jun
16

Road Maintenance Method Statement Including Cracks Potholes Patches Edge Breaks

Typical operation vehicles for temporary traffic management

Contractor will carry out the road maintenance and construction works in compliance with the technical specification and engineer’s instructions. With the direction and instruction of the client/ consulting engineer, at the designated areas, the motor graders and excavators are used to clear,