Demolition of any structure is a ground to earth technique which means destroying down or falling down of a building with the help of equipment’s, machineries, and explosives or with manual techniques without affecting the surrounding. Demolition means dismantling, razing, destroying or
Read More
This project management procedure describes the activities related to project progress report and progress control methods and Reports to enable effective monitoring of a project. Progress Measurement Procedure Progress measurements shall be undertaken on a regular basis of all works in progress.
Read More
Below is a precise method statement for erection and welding of vertical Bracing for steel buildings and structures as per the project requirements. Sequence of activities for Bracing Erection are as follows Receiving material from stores and temporarily stacking them if necessary
Read More
This procedure defines the requirements for gabion wall basket or mattress installation works, in order to maintain the soil stability for any kind of installations including landscaping and pipe works etc. Where multiple activities are scheduled, the general contractor is to review
Read More
This method statement represents the proposed construction procedure for the bituminous roads, kerbs, tiles and paver block installation activities. It is the overall responsibility of the project manager for road work, to ensure that the site preparation activities and safety requirements are
Read More
The purpose of this safe work method statement is to provide direction to the project management team on assessing, managing, controlling and the general use of plant and equipment, along with the operators, on site to ensure maximum safe guards are in
Read More