Civil Method Statement For Wet Area Water Proofing Works

Following equipment and tools may be used as required during Wet Area Water Proofing works.

WATER PROOFING PROCEDURE

Storage and Handling of Materials:

Surface Preparation Before Water Proofing:

Prime Coating:

Coating Application:

Inspection and Testing:

Water shall be provided for flood test for minimum 24 hour for all waterproofed floor areas.

 Cleaning:

Clean all tools and equipment immediately before polymerization with Xylene.