This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the concrete works: Batching Plants Mobile Concrete Pumps Truck-mixers Air Compressor Mobile Water Tank Diesel Generator Risk
Read More
This method statement represents the proposed construction procedure for the bituminous roads, kerbs, tiles and paver block installation activities. It is the overall responsibility of the project manager for road work, to ensure that the site preparation activities and safety requirements are
Read More
This method statement provide details and procedures which will and is to be followed for the successful construction of concrete plinths for the Blowers, Backwash Pumps and Transfer Pumps in the Machine Room. The Supervision of the installation will be done by
Read More
The purpose of this civil work method statement is to define the procedure for piling construction works at a project in accordance with the requirements specified in the relevant specifications, procedures and drawings, considering safety and quality of the work activities. The
Read More
This document describes the methods proposed to be used for the concrete repair activities that will be carried out as part of construction works for any kind of project. During the concrete repairing works quality system will be operated conforming to related
Read More
This method statement describes step by step the detailed requirements and procedure of site mobilization in accordance with the contract requirement and specifications. RESPONSIBILITIES Project Manager : Ensure all required submittal are made in a timely manner. Work progress is carried out
Read More