PROJECT MANAGEMENT RESPONSIBILITIES FOR SPECIALIST LIGHTING CONSULTANT

PROJECT MANAGEMENT RESPONSIBILITIES FOR SPECIALIST LIGHTING CONSULTANT FOR TYPICAL OFFICE, HOTEL & RESIDENTIAL TOWER PROJECTS. HOTEL TOWER INTERIOR LIGHTING – BASEMENT Discotheque (architectural lighting). Public Washrooms. Common Circulation areas between Disco & Washrooms. Entrance to Nightclub at Level B1. Staircase from ground to Level B2. GROUND FLOOR Both Entrance lobby’s including Grand Staircase Lobby bar. Typical lift… Read More: PROJECT MANAGEMENT RESPONSIBILITIES FOR SPECIALIST LIGHTING CONSULTANT »

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE CONSTRUCTION MAIN CONTRACTOR

The Contractor shall undertake and complete the Works in accordance with the requirements of the construction Contract and shall liaise and consult with the Project Manager and the Engineer in administrating, coordinating and managing the project in accordance with its own approved procedures in general [as approved by the Engineer] and the requirements of the… Read More: PROJECT MANAGEMENT RESPONSIBILITIES FOR THE CONSTRUCTION MAIN CONTRACTOR »

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT All required design works are to be carried out to internationally recognized standards, in compliance with local codes and regulations and to the owner hotel operator’s requirements incorporating the latest standards and technology applicable to this type of development. IT & AUDIO-VISUAL SCOPE OF WORK… Read More: PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT »

PROJECT RESPONSIBILITIES OF THE INTERIOR DESIGNER AT DIFFERENT STAGES

PROJECT RESPONSIBILITIES OF THE INTERIOR DESIGNER AT DIFFERENT STAGES PHASE 1 – CONCEPT DESIGN: The I.D Consultant will initially: Analyze the concept space planning with the Engineers and review the architectural layout to enhance and optimize the interior planning, circulation and special relationship between the key facilities. Agree with the Clients Representative all preliminary information necessary… Read More: PROJECT RESPONSIBILITIES OF THE INTERIOR DESIGNER AT DIFFERENT STAGES »

PROJECT MANAGEMENT RESPONSIBILITIES OF THE ACOUSTIC NOISE CONTROL SPECIALIST CONSULTANT

Consultant has reviewed and is familiar with all drawings and equipment proposed to be furnished on the project.  The following analysis will be conducted: Noise Criteria: At the outset of our work, CONSULTANT will review the latest relevant design documents and determine appropriate acoustical criteria. Where these are not defined in the Building Specification, CONSULTANT… Read More: PROJECT MANAGEMENT RESPONSIBILITIES OF THE ACOUSTIC NOISE CONTROL SPECIALIST CONSULTANT »