Category Archives: Health & Safety

Project HSE Training, Awareness and Competence Procedure

Project safety training for all project personnel is completed on the projects in accordance with the requirements documented in this hse training procedure as identified below. The Management of Health and Safety at work places a duty on every company to: 1. Take into account employees capabilities as regards Health and safety, 2. Provide adequate… Read More: Project HSE Training, Awareness and Competence Procedure »

Workplace House Keeping Method for Site Contamination Control

The purpose of this procedure is to provide general guidelines for implementation of controls to reduce the risk of contaminating the workplace and the natural environment. This standards safety instruction applies to all project site workplaces for maintaining good house keeping. Building construction and any other civil engineering works often involve redevelopment of land which… Read More: Workplace House Keeping Method for Site Contamination Control »

Mobile Plant and Machinery Safe Operation Method Statement at Construction Project

The purpose of this safe work method statement is to provide direction to the project management team on assessing, managing, controlling and the general use of plant and equipment, along with the operators, on site to ensure maximum safe guards are in place. This work instruction addresses safety instructions for both projects and other workplaces… Read More: Mobile Plant and Machinery Safe Operation Method Statement at Construction… »

Abrasive Wheels Risk Assessment & Control Measures

This risk assessment is applicable for Chop Saws, Angle Grinders, Bench Grinders, cutting and grinding tasks in mechanical, fabrication and electrical disciplines. Hazards related to abrasive wheel include: Fire/explosion through ignition of sparks Bursting of abrasive wheel or disc at high speed Contact with wheel or disc resulting in laceration or amputation Losing control of the Equipment Clothing entanglement… Read More: Abrasive Wheels Risk Assessment & Control Measures »

Risk Assessment for Electrical Work Up To 415 Volts

This electrical risk assessment covers all operations related to electrical LV, MV inspection and testing. Related hazards include: Electrocution Electric Burn Fire Explosion Control Measures  5 Golden Rules to avoid accidents due to electricity: 1. Disconnect completely ( the apparatus on which you are to work) Live work is too avoided at all times (as… Read More: Risk Assessment for Electrical Work Up To 415 Volts »