Category Archives: Road Work

Specific Gravity and Water Absorption Aggregate Testing Method

The purpose of this procedure is to determine the specific gravity and water absorption of given sample of aggregates for road works. Specific gravity of an aggregate is considered to be a measure of strength or quality of the material. Stones having low specific gravity are generally weaker than those with higher specific gravity values.… Read More: Specific Gravity and Water Absorption Aggregate Testing Method »

Download Road Construction Method Statement Package

Professional Method Statement for Road Construction Works, Testing & Civil QA/QC Documentation Looking for a complete and consultant-approved Road Construction Method Statement package? This professionally prepared documentation package is specially designed for civil contractors, infrastructure companies, QA/QC engineers, highway engineers and project teams involved in road construction works for highways, urban roads, industrial developments and… Read More: Download Road Construction Method Statement Package »

Roadworks Road Construction Method Statement

Below work method statement outlines the steps to apply and lay pavement for the road construction consisting sub-base of granular material, road base of crusher run, asphaltic concrete binder course and asphaltic concrete wearing course. Method statement shall apply for all roadworks related with a road construction project. The intention of this work method statement… Read More: Roadworks Road Construction Method Statement »

Gabion Wall Basket Geotextile Installation Method Statement

This procedure defines the requirements for gabion wall basket or mattress installation works, in order to maintain the soil stability for any kind of installations including landscaping and pipe works etc. Where multiple activities are scheduled, the general contractor is to review in advance the priority of work and schedule the appropriate time frame to… Read More: Gabion Wall Basket Geotextile Installation Method Statement »

Aggregate Crushing Value Test Method

The purpose of this method is to determine the crushing value of the given sample of aggregate for the road construction works. The Principal mechanical properties required in road stones are: Satisfactory resistance to crushing under the roller during construction and Adequate resistance to surface abrasion under traffic. Also stresses under rigid tyre rims of… Read More: Aggregate Crushing Value Test Method »

Pavement Materials Classification and Properties

Aggregates form the major portion of pavement structure and they form the prime materials used in pavement construction. Aggregates have to bear stresses occurring due to the wheel loads on the pavement and on the surface course they also have to resist wear due to abrasive action of traffic. These are used in pavement construction… Read More: Pavement Materials Classification and Properties »