Chilled Water System Installation, Pressure Testing, Insulation and Cladding

On this page you can find method statement for chilled water system installation, pressure testing, insulation and cladding. By following this method of statement hvac contractor shall comply with standard requirements for installation, pressure testing, insulation and cladding of chilled water piping network including valves and accessories. Following the the guidelines contained herein installer shall… Read More: Chilled Water System Installation, Pressure Testing, Insulation and Cladding »

AHU Installation Method Statement

This document defines the method statement for the installation of AHU at construction site in compliance with the approved designs and approved material submittals. Prior to installation of AHU, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and are in place. All installation I Construction I Testing works shall be carried out  in… Read More: AHU Installation Method Statement »

HVAC Duct Work Methodology Including Dampers and Access Doors

Below is a precise method statement that applies to installation of HVAC Supply, Return and Exhaust ducts, dampers, fire dampers and access doors. The purpose of this method statement is to outline the method of storage and installation of HVAC supply, return and exhaust ducts including fixing of dampers, fire dampers and access doors. G.I.… Read More: HVAC Duct Work Methodology Including Dampers and Access Doors »

Refrigerant Piping Installation & Pressure Testing Method Statement

This page provides detailed procedure or method statement for the installation of refrigerant piping, we have included necessary tools requirements and the procedure of refrigerant method statement for installation and testing of copper pipes. Project manager is overall responsible for implementation of this method statement and relevant quality, health and safety requirements. Before starting the… Read More: Refrigerant Piping Installation & Pressure Testing Method Statement »

Mechanical Equipment Inspection Checklists During Construction Project Lifecycle

Below is a comprehensive list of different inspection requirements for receiving storing and installation of different mechanical/HVAC equipment’s. These inspections must be completed throughout the project at its different stages i.e. delivery, storage, installation & pre-commissioning before the functional testing occurs. Delivery Inspections Once the equipment i.e. FCU arrives at the site, usually delivered by… Read More: Mechanical Equipment Inspection Checklists During Construction Project Lifecycle »

Air Conditioning Installation of DX Split Units Including Refrigerant Piping & Brazing

This air conditioning method statement is developed for any kind of the project in order to achieve best quality of work at all levels for ac installation activity. Method Statement covers all the critical installation activities of air conditioning systems that includes refrigerant piping installation, brazing and air conditioning unit installation. Purpose of this procedure… Read More: Air Conditioning Installation of DX Split Units Including Refrigerant Piping… »