Category Archives: HVAC Method Statement

AC Installation Method Statement for Split Unit / Mini Split

Below is a brief HVAC method statement that covers the Installation air conditioning split unit. By following this procedure installer will ensure that the installation has been carried out as per contract specifications and manufacturer’s recommendations. The method statement gives details of how the ac installation work will be carried out and the how the… Read More: AC Installation Method Statement for Split Unit / Mini Split »

Piping Insulation and Jacketing Method Statement

Table of Content Purpose References Insulation Material Storage Of Materials Preparation Of Insulation Insulation Procedure Final Acceptance Inspection Procedure 1. Purpose The purpose of this method Statement is to describe the execution procedure for the supply and installation of Hot & Personnel Protection insulation works of Piping, Valves and Flanges. This method statement provides the… Read More: Piping Insulation and Jacketing Method Statement »

Steel Structure Fabrication Method Statement

Propose of this method statement is to describe the sequence of activities which will be followed to execute the steel structure fabrication works, including unloading of the raw materials and loading of fabricated materials to dispatch at project site. Below is list of plant machinery and necessary equipment for doing the fabrication of steel structure… Read More: Steel Structure Fabrication Method Statement »

Fire Sprinkler System Installation Method Statement

Below method statement covers the method and procedures for installation of fire fighting sprinkler pipe works inside the building. The method of statement is applicable to all internal fire fighting pipes, riser works and sprinklers. Reference Documents: Approved Drawings. Project Specification. NFPA 13 section 10-2.2. Necessary Tools and Equipment Measuring Tape Grooving Machine Threading Machine… Read More: Fire Sprinkler System Installation Method Statement »

Water Supply Piping Installation Method of Statement

This method statement covers the nature and type of work for water supply piping system Pipes & Fittings installation and Testing as per site requirements for any kind of the project. All documentary requirements for this plumbing procedure will be submitted for approval and this will include Manufacturers data, certificate of compliance, brand designation, type… Read More: Water Supply Piping Installation Method of Statement »

Method Statement for Stormwater Drainage

Below is precise method statement for drainage works covering sanitary, vent and stormwater pipes. Stormwater drainage is an important system for any kind of construction project. This plumbing method statement covers the installation of sanitary, vent and stormwater drainage piping system. The purpose of stormwater drainage installation procedure is to ensure that drainage and vent… Read More: Method Statement for Stormwater Drainage »