Tag Archives: Installation of Steel Structure

Vertical Bracing Construction Method of Steel Buildings Structure

Below is a precise method statement for erection and welding of vertical Bracing for steel buildings and structures as per the project requirements. Sequence of activities for Bracing Erection are as follows Receiving material from stores and temporarily stacking them if necessary in proper location. Fixing of ladder on the pipe bracing by proper welding.… Read More: Vertical Bracing Construction Method of Steel Buildings Structure »

Steel Structure Fabrication Method Statement

Propose of this method statement is to describe the sequence of activities which will be followed to execute the steel structure fabrication works, including unloading of the raw materials and loading of fabricated materials to dispatch at project site. Below is list of plant machinery and necessary equipment for doing the fabrication of steel structure… Read More: Steel Structure Fabrication Method Statement »