Tag Archives: electrical panel installation procedure

METHOD STATEMENT FOR INSTALLATION OF LV SWITCHBOARDS, MCCs, CAPACITOR BANKS, VFDs, SMDBs AND DISTRIBUTION BOARDS

The purpose of this Method Statement is to establish a systematic procedure for the safe handling, installation, inspection, testing, and commissioning of Low Voltage (LV) Switchboards, Motor Control Centers (MCCs), Capacitor Banks, Variable Frequency Drives (VFDs), Sub Main Distribution Boards (SMDBs), and Distribution Boards (DBs). This document ensures that all installation activities are executed in… Read More: METHOD STATEMENT FOR INSTALLATION OF LV SWITCHBOARDS, MCCs, CAPACITOR BANKS,… »

Electrical Installation Method Statement for HV Panels

All workers to attend safety induction conducted by main contractor and specific training on the safe installation methods. Install HV Panels as indicated on the approved shop drawing and as per specification and according to manufacturer’s recommendation. Site Engineer and Site Supervisor will give necessary instructions to tradesmen (electrical technician) and provide necessary approved construction/shop… Read More: Electrical Installation Method Statement for HV Panels »