2021
Mar
22

Electrical Installation Method Statement for HV Panels

Method Statement for HV Panels Installation

All workers to attend safety induction conducted by main contractor and specific training on the safe installation methods. Install HV Panels as indicated on the approved shop drawing and as per specification and according to manufacturer’s recommendation. Site Engineer and Site Supervisor

error: Content is protected !!