Below is step wise civil work method statement for tile fixing and installation of ceramic, porcelain & agglomerate tiling works for any kind of building projects. Following is list of necessary equipment’s and tools that are mandatory for the tiling work: Drum
Read More
Below is best construction method statement that also covers the quality planning at construction site of civil engineering project. Below is list of activities that are covered in this civil contractor method of statement. Excavation work, including soil excavation, soil disposal, backfill
Read More
The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the construction work in compliance to standard and good practice at all stages and activities for the Erection & Dismantling of the Slab Formwork
Read More
This method statement provides the control sequence and installation methodology that will be used for supply, laying and fixing or installation of Stone Flooring (Marble/Granite Flooring), Finishes shown on the approved Shop Drawings or finishing schedules in compliance with the Project Specification.
Read More
EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 : 2 Nos. Hydraulic Saw Head, HILTI DSTS 30 : 2 Nos. Hydraulic Hoses (set of 6 hoses) : 2 Nos. Remote Control : 2 Nos. Coring Machines HILTI DD250 : 2
Read More
REQUIRED INSTALLATION TOOLS: Installation power hoist – TIRAK X series 750 kg capacity with pulleys Manual chain pulley block Over Speed Governor Hanger positioning rod Safety pedal for Over Speed Governor Parking chain 2m, 1500 kg Plumbing tool set Plumbing support Car
Read More