Category Archives: Electrical Engineering

METHOD STATEMENT FOR INSTALLATION OF LV SWITCHBOARDS, MCCs, CAPACITOR BANKS, VFDs, SMDBs AND DISTRIBUTION BOARDS

The purpose of this Method Statement is to establish a systematic procedure for the safe handling, installation, inspection, testing, and commissioning of Low Voltage (LV) Switchboards, Motor Control Centers (MCCs), Capacitor Banks, Variable Frequency Drives (VFDs), Sub Main Distribution Boards (SMDBs), and Distribution Boards (DBs). This document ensures that all installation activities are executed in… Read More: METHOD STATEMENT FOR INSTALLATION OF LV SWITCHBOARDS, MCCs, CAPACITOR BANKS,… »

Lighting Control System Installation Method Statement

Below method statement defines step by step procedure for lighting control system installation. By following this electrical methodology the installer shall make sure that the installation job execution complies with the project requirements and serves the intended function to the satisfaction of the client/consultant. This method statement refers to various work procedures contained within project… Read More: Lighting Control System Installation Method Statement »

High Voltage Underground Cable Installation

Below is a precise electrical method statement that explains step by step procedure high voltage underground cable installation. By following this cable laying procedure installer shall ensure that the job execution complies with the project requirements and serves the intended function to satisfaction of the client. Overall project manager is responsible for implementation of this… Read More: High Voltage Underground Cable Installation »

Electrical Power Busbar System Installation Method Statement

This procedure defines the methods to be adopted for the installation of Busbar System. Document ensures that the electrical installation works at site are in compliance with the approved shop drawing and approved material submittal. Scope of this method statement is procedure for Material Delivery Inspection, storage and Installation of Busbar system. During the receiving… Read More: Electrical Power Busbar System Installation Method Statement »

Electrical Installation Method Statement for HV Panels

All workers to attend safety induction conducted by main contractor and specific training on the safe installation methods. Install HV Panels as indicated on the approved shop drawing and as per specification and according to manufacturer’s recommendation. Site Engineer and Site Supervisor will give necessary instructions to tradesmen (electrical technician) and provide necessary approved construction/shop… Read More: Electrical Installation Method Statement for HV Panels »