UPS Power Supply System

By | October 6, 2026

Purpose of the UPS power supply system installation is to ensure the clean & optimum power availability for the critical systems and equipment in the different area of any building or project in case of main power failure.

Major equipment that are interfaced with UPS include MDF/IDF rooms, servers, emergency systems like access control fire smoke alarm etc.

UPS power supply ensures that in case of power failure these systems or  equipment can be run on UPS with help of UPS backup battery.

The MGE Galaxy™ 5500 UPS Power Supply System

The MGE Galaxy 5500 60 kVA range offers reliable and flexible secure ups supply power in a fully integrated package solution.

Its highly efficient transformer-free double conversion technology delivers installation and running cost savings.

With a rated output power factor of 0.9, MGE G5500is also able to provide 12.5% greater active power than a traditionally rated 0.8 power factor UPS.

MGE Galaxy 5500 achieves up to 94% efficiency in double conversion mode and up to 97% in Eco mode, thus ensuring effective load protection, while reducing the total cost of ownership (TCO) and environmental impact.UPS Power Supply System

MGE Galaxy 5500 combination of performance features, impressive integrated autonomy and compact footprint make it ideal for guaranteeing clean, continuous power for a wide range of applications from IT and manufacturing to retail and transport.

Its low THDi (< 3%) and active input power factor correction ensure that the current absorbed from the upstream distribution network is near equal to its nominal output current, hence eliminating the need for oversizing genets and other equipment.

The entire Smart-UPS On-Line (10 Kva &5 Kva ,2 Kva)family provides value to customers with demanding power environments, including a very wide input voltage window, extremely tight output voltage regulation, frequency regulation, internal bypass, and input power factor correction.

Smart-UPS On-Line combination of performance features, impressive integrated autonomy and compact footprint make it ideal for guaranteeing clean, continuous power for a wide range of applications from IT and manufacturing to retail and transport.

Its low THDi (< 3%) and active input power factor correction ensure that the current absorbed from the upstream distribution network is near equal to its nominal output current, hence eliminating the need for oversizing genets and other equipment.

The MGE Galaxy™ 5500 is the latest advanced engineered UPS power supply system that increases the performance and reliability that APC™ by Schneider Electric™ customers have come to recognize and appreciate.

Online technology fully isolates and protects against all power quality disturbances in even the most demanding environments.

High efficiency in double conversion or ECO mode saves valuable energy costs and a comprehensive range of options enables the MGE Galaxy 5500 to be highly effective in any application.

The output electrical performances are fully aligned with today’s latest load requirements that include upstream harmonics management for a generator-friendly installation and flexible configurations due to the wide range of integrated options and auxiliary equipment.

Complete front access allows for a space-saving footprint, user-friendly graphical display with multiple language options, and an SNMP with network-based power management card that all ship standard.

Also the BMS system for the remote monitoring features makes the MGE Galaxy 5500 one of the easiest UPS units in its class to manage and maintain.

MGE Galaxy 5500 UPS Supply Features

  • IGBT-based technology for power quality: Supplies clean, stable power to sensitive loads, ensuring critical power protection, optimum performance, and extended life.
  • Dual input: Allows for connection to two separate input sources for increased availability.
  • Parallel operation: Connect as many as six units in parallel for capacity and redundancy to grow with your power requirements.
  • Redundant components: Provides increased backup for greater reliability and ensures continuous operation.
  • Built-in static and maintenance bypass: Enables the UPS unit to transfer the load to utility power, without interruption, in the event of heavy overload or fault.

The Liebert® NXC 10 – 40  kVA UPS Power Supply

The Liebert® NXC 10 – 40  kVA range offers reliable and  flexible secure power in a fully integrated package solution. Its highly efficient transformer-free double conversion technology delivers installation and running cost savings. With a rated  output power factor of 0.9, Liebert® NXC is also able to provide 12.5% greater active  power than a traditionally rated 0.8 power factor UPS.

Liebert® NXC achieves up to 95% efficiency in double conversion mode and up to 98% in Eco mode, thus ensuring effective load protection, while reducing the total cost of ownership (TCO) and  environmental impact.

Liebert® NXC’s combination of performance features, impressive integrated autonomy and compact footprint make it ideal for guaranteeing clean, continuous power for a wide range of applications from IT and manufacturing to retail and transport.

Its low THDi (< 4%) and active input power factor correction ensure that the current absorbed from the upstream distribution network is near equal to its nominal output current, hence eliminating the need for oversizing gensets and other equipment.

Other Resources for UPS Power Supply System

UPS & Accessories Installation Method Statement Package – Download Editable Files