2026
Apr
26

Design of Temporary Works for Completing Permanent Works on Projects

Design of Temporary Works on Construction Projects

This procedure describes the requirements on the design of temporary works. The purpose of this procedure is to provide adequate drawings and method statements for the temporary works that are necessary for the completion of the permanent works. The design and /

2026
Feb
10

AHU Installation Method Statement

This document defines the method statement for the installation of AHU at construction site in compliance with the approved designs and approved material submittals. Prior to installation of AHU, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and

2026
Feb
3

Sub Surface Geotechnical Investigation Requirements for Structures/Bridge Foundations

Sub Surface Geotechnical Investigation Requirements for Structures/Bridge Foundations

For the design of bridges foundation, the scope of subsurface exploration shall be to determine soil parameters and rock characteristics and their suitability by insitu testing or testing of samples/cores taken out of exploration. It shall be planned in such a way

2026
Jan
26

Mobile Plant and Machinery Safe Operation Method Statement at Construction Project

The purpose of this safe work method statement is to provide direction to the project management team on assessing, managing, controlling and the general use of plant and equipment, along with the operators, on site to ensure maximum safe guards are in

2026
Jan
18

Gabion Wall Basket Geotextile Installation Method Statement

This procedure defines the requirements for gabion wall basket or mattress installation works, in order to maintain the soil stability for any kind of installations including landscaping and pipe works etc. Where multiple activities are scheduled, the general contractor is to review

error: Content is protected !!