Below is step wise civil work method statement for tile fixing and installation of ceramic, porcelain & agglomerate tiling works for any kind of building projects. Following is list of necessary equipment’s and tools that are mandatory for the tiling work: Drum
Read More
The purpose of this procedure is to define how screeds/toppings shall be carried out under controlled condition. This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. Method statement
Read More
Before start of drainage system piping installation and testing completeness of the related works and systems shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records. Make sure that all tools/equipment/instruments required are calibrated and having
Read More
The purpose of this method statement is to make sure that hydrostatic pressure testing of spherical tanks is done safely as per client requirements, specifications and applicable local and international standards. Method statement is applicable for saturated and unsaturated LPG storage and
Read More
1. What is the difference between working stress approach and limit state approach? For working stress approach, service loads are used in the whole design and the strength of material is not utilized in the full extent. In this method of design,
Read More
This method statement explains and covers the installation & inspection of cast resin Transformers but can be useful for other types of transformers. The electrical standard procedure can be used for any kind of construction project covering the electrical scope of work.
Read More