Method Statement of Concreting for Vertical Elements Retaining Wall, Shear Walls & Columns

method statement for concrete works

Below is a precise method statement for concrete works for vertical elements (Retaining Wall, Shear Walls, Columns etc.) Following equipment shall be arranged before starting the concrete pouring work: Survey Instruments Tower/Mobile Crane Mechanical Vibrators / Internal Vibrators Concrete Pumps Transit Mixer

2024
Apr
17

Project Execution Plan – General Template

PURPOSE OF GENERIC PROJECT EXECUTION PLAN This document has been formulated to enable the compilation of a Project Execution Plan (PEP) for any type of construction project. This generic document has been formulated to cover all reasonable variables that would need to

2024
Apr
6

Shop Drawing Standard Procedure for Construction Company

Shop Drawing Standard Procedure for Construction Company

This technical department procedure describes the requirements on shop drawings prepared by contracting company or by its subcontractors, vendors, or manufacturers to ensure all parties meet the company’s requirements in relation to engineering and construction design. The procedure is applicable for all