Contractor will carry out the road maintenance and construction works in compliance with the technical specification and engineer’s instructions. With the direction and instruction of the client/ consulting engineer, at the designated areas, the motor graders and excavators are used to clear,
Read More
Below is a standard method statement for plastering works, which must be followed for any kind of project. Any suitable location can be designated by the client/consultant for the construction of Mock Up, prior to start the actual work in order to
Read More
Below is step wise civil work method statement for tile fixing and installation of ceramic, porcelain & agglomerate tiling works for any kind of building projects. Following is list of necessary equipment’s and tools that are mandatory for the tiling work: Drum
Read More
The purpose of this procedure is to define how screeds/toppings shall be carried out under controlled condition. This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. Method statement
Read More
Before start of drainage system piping installation and testing completeness of the related works and systems shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records. Make sure that all tools/equipment/instruments required are calibrated and having
Read More
The purpose of this method statement is to make sure that hydrostatic pressure testing of spherical tanks is done safely as per client requirements, specifications and applicable local and international standards. Method statement is applicable for saturated and unsaturated LPG storage and
Read More