High Voltage Underground Cable Installation

Below is a precise electrical method statement that explains step by step procedure high voltage underground cable installation. By following this cable laying procedure installer shall ensure that the job execution complies with the project requirements and serves the intended function to satisfaction of the client. Overall project manager is responsible for implementation of this… Read More: High Voltage Underground Cable Installation »

Project Management Procedure for Surveillance of Subcontractors’ Operations

In order to ensure quality in all aspects of the construction site, close watch of subcontractors’ operations is no doubt compulsory. Every contractor shall establish and document an appraisal system to verify their sub contractor’s implementation of and conformance to the project quality plan and contract technical specification requirements. The appraisal shall cover all the… Read More: Project Management Procedure for Surveillance of Subcontractors’ Operations »

Download Road Construction Method Statement Package

Professional Method Statement for Road Construction Works, Testing & Civil QA/QC Documentation Looking for a complete and consultant-approved Road Construction Method Statement package? This professionally prepared documentation package is specially designed for civil contractors, infrastructure companies, QA/QC engineers, highway engineers and project teams involved in road construction works for highways, urban roads, industrial developments and… Read More: Download Road Construction Method Statement Package »

Concrete Pouring Method Statement for Construction Work using Ready Mix Concrete

This civil work method statement shall address the requirements of project site operations applicable for the supply and placing of structural and nonstructural concrete pouring on the construction work project. Following this method of statement will ensure that concrete works activity will be expedite in an efficient and safe manner in accordance with all relevant… Read More: Concrete Pouring Method Statement for Construction Work using Ready Mix… »

Fire Hose Reel & Cabinets Testing and Commissioning Method Statement For Fire Fighting System

This Fire Hose Reel & Cabinets Testing and Commissioning Method Statement is to provide guidance in carrying out and controlling the testing and commissioning of Fire Fighting system for the project, in accordance with the approved Project Quality Plan, contract specifications and Commissioning plan. The Test Involves Testing of Fire Hose Reel, Cabinet and Fire Extinguishers. Necessary… Read More: Fire Hose Reel & Cabinets Testing and Commissioning Method Statement… »

Construction Project Documentation Procedure

Contractor’s QC documentation must cover all aspects of quality control program activities, and includes Daily Inspection Reports and Daily Test Reports. After quality control plan QCP approval by the client, the contractor will document the QC activities pursuant to the QCP. Daily Record Keeping Project documents will be managed through a combination of a secure… Read More: Construction Project Documentation Procedure »