Author Archives: Web Master

Roadworks Road Construction Method Statement

Below work method statement outlines the steps to apply and lay pavement for the road construction consisting sub-base of granular material, road base of crusher run, asphaltic concrete binder course and asphaltic concrete wearing course. Method statement shall apply for all roadworks related with a road construction project. The intention of this work method statement… Read More: Roadworks Road Construction Method Statement »

Detailed Project Construction Methodology Civil Works & MEP Works

Below you can find a complete Project Specific Construction Methodology. Following are the sections or table of content included in the document: 1.0 Civil Works 2.0 Block Work 3.0 Plastering 4.0 Ceramic Floor and Wall Tiles – Granite and Terrazzo Tiles 5.0 Painting 6.0 Aluminium 7.0 Suspended Ceilings 8.0 External Works 9.0 Mechanical, Electrical &… Read More: Detailed Project Construction Methodology Civil Works & MEP Works »

Workplace House Keeping Method for Site Contamination Control

The purpose of this procedure is to provide general guidelines for implementation of controls to reduce the risk of contaminating the workplace and the natural environment. This standards safety instruction applies to all project site workplaces for maintaining good house keeping. Building construction and any other civil engineering works often involve redevelopment of land which… Read More: Workplace House Keeping Method for Site Contamination Control »

Site Preparation and Mobilization Method Statement

This project method statement describes the construction methodology and procedures amidst other details for the actualization of the summary task i.e. site preparation in respect of the subject project for the Engineering, Procurement, Installation and Commissioning (EPIC) of project building. This Method Statement is however to read and applied in conjunction with Job Safety Analysis… Read More: Site Preparation and Mobilization Method Statement »

Design of Temporary Works for Completing Permanent Works on Projects

This procedure describes the requirements on the design of temporary works. The purpose of this procedure is to provide adequate drawings and method statements for the temporary works that are necessary for the completion of the permanent works. The design and / or verification of temporary works shall be performed by project personnel or external… Read More: Design of Temporary Works for Completing Permanent Works on Projects »

Sub Surface Geotechnical Investigation Requirements for Structures/Bridge Foundations

For the design of bridges foundation, the scope of subsurface exploration shall be to determine soil parameters and rock characteristics and their suitability by insitu testing or testing of samples/cores taken out of exploration. It shall be planned in such a way that the profiles of different types of soil and/or rock up to the… Read More: Sub Surface Geotechnical Investigation Requirements for Structures/Bridge Foundations »