Design of Temporary Works on Construction Projects

General Contractor Building Construction Method for Civil Works

This civil work method statement is prepared to ensure that construction of buildings for the project shall comply on plans specifications and all  relevant standard and code requirements in the execution of different work activities to be performed in the construction of buildings and other relevant structures associated with the…
Concrete Pouring Method Statement for Construction Work using Ready Mix Concrete

Concrete Pouring Method Statement for Construction Work using Ready Mix Concrete

This civil work method statement shall address the requirements of project site operations applicable for the supply and placing of structural and nonstructural concrete pouring on the construction work project. Following this method of statement will ensure that concrete works activity will be expedite in an efficient and safe manner…
Civil Method Statement For Wet Area Water Proofing Works

Civil Method Statement For Wet Area Water Proofing Works

Following equipment and tools may be used as required during Wet Area Water Proofing works. Wire Brushes Soft Brushes Air Compressor Empty containers / drums Stirrer / Rod Paint Brushes Paint rollers Wheel barrow Spatula Other hand tools Waterproof 360 PU (Liquid applied Polyurethane Waterproofing Membrane) WATER PROOFING PROCEDURE Storage…