Concrete Pouring Method Statement for Construction Work using Ready Mix Concrete

Concrete Pouring Method Statement for Construction Work using Ready Mix Concrete

This civil work method statement shall address the requirements of project site operations applicable for the supply and placing of structural and nonstructural concrete pouring on the construction work project. Following this method of statement will ensure that concrete works activity will be expedite in an efficient and safe manner…
General Civil Method Statement For Foundations Construction

General Civil Method Statement For Foundations Construction

1. Purpose 2. Scope 3. Definitions 4. Responsibilities 5. Safety 5.1 Machinery and Equipment 5.2 Personal Protective Equipment 5.3 Safety Arrangement during the foundation work 6. Working Method 6.1       Preparing Work 6.2        Survey and Setting out 6.3       Excavation 6.4       Dewatering 6.5       Piles (where applicable) 6.6…
Civil Method Statement For Wet Area Water Proofing Works

Civil Method Statement For Wet Area Water Proofing Works

Following equipment and tools may be used as required during Wet Area Water Proofing works. Wire Brushes Soft Brushes Air Compressor Empty containers / drums Stirrer / Rod Paint Brushes Paint rollers Wheel barrow Spatula Other hand tools Waterproof 360 PU (Liquid applied Polyurethane Waterproofing Membrane) WATER PROOFING PROCEDURE Storage…
Method Statement For Removal Of Concrete Brackets  Earlier Provided For Struts

Method Statement For Removal Of Concrete Brackets Earlier Provided For Struts

EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 :  2 Nos. Hydraulic Saw Head, HILTI DSTS 30 :  2 Nos. Hydraulic Hoses (set of 6 hoses) :  2 Nos. Remote Control :  2 Nos. Coring Machines HILTI DD250 :  2 Nos. Drilling Machines HILTI TE 2 :  2…