Tag Archives: Civil Method Statement

Concrete Pouring Method Statement for Construction Work using Ready Mix Concrete

This civil work method statement shall address the requirements of project site operations applicable for the supply and placing of structural and nonstructural concrete pouring on the construction work project. Following this method of statement will ensure that concrete works activity will be expedite in an efficient and safe manner in accordance with all relevant… Read More: Concrete Pouring Method Statement for Construction Work using Ready Mix… »

General Contractor Building Construction Method for Civil Works

This civil work method statement is prepared to ensure that construction of buildings for the project shall comply on plans specifications and all  relevant standard and code requirements in the execution of different work activities to be performed in the construction of buildings and other relevant structures associated with the project in general. In addition… Read More: General Contractor Building Construction Method for Civil Works »

Foundation Construction Civil Method Statement

The purpose of this general method statement is to describe the construction procedures for the isolated pile cap and pad foundations. Large raft foundations will be covered in specific foundation method statements and are not included in this document. The works will incorporate the procedures necessary to execute the following items:­ Preparing of Work Survey… Read More: Foundation Construction Civil Method Statement »

Method Statement For Removal Of Concrete Brackets Earlier Provided For Struts

EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 :  2 Nos. Hydraulic Saw Head, HILTI DSTS 30 :  2 Nos. Hydraulic Hoses (set of 6 hoses) :  2 Nos. Remote Control :  2 Nos. Coring Machines HILTI DD250 :  2 Nos. Drilling Machines HILTI TE 2 :  2 Nos. Diamond Wire :  1… Read More: Method Statement For Removal Of Concrete Brackets Earlier Provided For… »

Civil Method Statement For Wet Area Water Proofing Works

Following equipment and tools may be used as required during Wet Area Water Proofing works. Wire Brushes Soft Brushes Air Compressor Empty containers / drums Stirrer / Rod Paint Brushes Paint rollers Wheel barrow Spatula Other hand tools Waterproof 360 PU (Liquid applied Polyurethane Waterproofing Membrane) WATER PROOFING PROCEDURE Storage and Handling of Materials: Materials… Read More: Civil Method Statement For Wet Area Water Proofing Works »