Drainage Installation Method Statement for Drainage Piping System

Below method statement covers the above ground drainage installation activities. By following this procedure contractor shall ensure that the installation of drainage piping has been carried out as per project contract requirements, specifications and best practices. It gives details of how the work will be carried out and what health and safety issues and relevant… Read More: Drainage Installation Method Statement for Drainage Piping System »

Wet Riser Piping and Landing Valve Installation Method Statement

This method statement is applicable for the installation of wet riser pipes, hose reels, related fittings and accessories. Following this standard procedure shall ensure that the firefighting pipe work and other related fittings and accessories are properly installed and conforms to the requirement of contract specifications, manufacturer instructions and NFPA 14 standard. Necessary Equipment /… Read More: Wet Riser Piping and Landing Valve Installation Method Statement »

Hydrostatic Pressure Testing of Spherical Pressure Vessels – Method Statement

The purpose of this method statement is to make sure that hydrostatic pressure testing of spherical tanks is done safely as per client requirements, specifications and applicable local and international standards. Method statement is applicable for saturated and unsaturated LPG storage and intermediate tanks. Project manager has the overall responsibility for implementing and ensuring compliance… Read More: Hydrostatic Pressure Testing of Spherical Pressure Vessels – Method Statement »

Fire Sprinkler System Installation Testing and Commissioning Method Statement

This procedure covers installation, pressure testing and functional commissioning of firefighting sprinkler system. Method statement covers an integrated system of underground and overhead piping designed in accordance with fire protection engineering standards. This method covers portion of the sprinkler system above ground in a network of specially sized OR hydraulically designed piping installed in a… Read More: Fire Sprinkler System Installation Testing and Commissioning Method Statement »

Closed Control Unit CCU Air Conditioning Unit Installation Method Statement

This method statement covers the installation of floor mounted Close Control Units CCU with down flow air delivery serving the room. Following this procedure will ensure the CCU installation has been carried out as per project/contract specifications and manufacturer’s recommendations. The mechanical method statement gives details of how the work will be carried out and… Read More: Closed Control Unit CCU Air Conditioning Unit Installation Method Statement »

Dewatering System Installation & Operation Method Statement

Dewatering is defined as the removal of the ground water to a level below the normal water table, to enable excavation and construction to be carried out in suitable and safe working condition. It is proposed to install a single-stage well point system and sump pumps to control the ground water within each excavation area.… Read More: Dewatering System Installation & Operation Method Statement »