2022
May
5

Mechanical Equipment Inspection Checklists During Construction Project Lifecycle

Below is a comprehensive list of different inspection requirements for receiving storing and installation of different mechanical/HVAC equipment’s. These inspections must be completed throughout the project at its different stages i.e. delivery, storage, installation & pre-commissioning before the functional testing occurs. Delivery

2021
Dec
10

AHU Installation Method Statement

This document defines the method statement for the installation of AHU at construction site in compliance with the approved designs and approved material submittals. Prior to installation of AHU, the supervisor and foreman will verify and ensure that all the safety requirements have been complied with and

2021
Jun
19

Project Landscaping Automatic Irrigation Works Method Statement

Project Landscaping Automatic Irrigation Works Method Statement

The objectives of this method statement is to briefly describe the major activities and set inspection milestones for irrigation system installation. Purpose of this procedure is to establish general guidelines addressing major requirements that are necessary to ensure that irrigation work conforms

2021
May
21

Method of Statement for Installation of Natural Gas System, Pipe Work, Distribution Lines and Branches

Method of Statement for Installation of Natural Gas System, Pipe Work, Distribution Lines and Branches

This method of statement is applicable for the installation of Natural Gas System, pipe work, distribution lines, gas branches inside the retails of the Building (regulators, gas meters, valves, etc.) for the building project. Project manager will have the overall responsibility of

2021
Mar
31

Fire Hose Reel & Cabinets Testing and Commissioning Method Statement For Fire Fighting System

Fire Hose Reel & Cabinets Testing and Commissioning Method Statement For Fire Fighting System

This Fire Hose Reel & Cabinets Testing and Commissioning Method Statement is to provide guidance in carrying out and controlling the testing and commissioning of Fire Fighting system for the project, in accordance with the approved Project Quality Plan, contract specifications and

error: Content is protected !!