Dewatering System Installation & Operation Method Statement
Dewatering is defined as the removal of the ground water to a level below the normal water table, to enable excavation and construction to be carried out in suitable and safe working condition. It is proposed to install a single-stage well point system and sump pumps to control the ground water within each excavation area.… Read More: Dewatering System Installation & Operation Method Statement »
