Tag Archives: Dewatering Procedure

Dewatering System Installation & Operation Method Statement

Dewatering is defined as the removal of the ground water to a level below the normal water table, to enable excavation and construction to be carried out in suitable and safe working condition. It is proposed to install a single-stage well point system and sump pumps to control the ground water within each excavation area.… Read More: Dewatering System Installation & Operation Method Statement »

Dewatering Method Statement

Below is a complete and precise dewatering method statement that covers the installation of the dewatering system as designed and detailed by temporary works designer/ consultant. Full time supervision shall be required to ensure the works are carried out in accordance to specifications, quality and approved drawings. Pumping Duration: Pumps shall be kept running to… Read More: Dewatering Method Statement »