Category Archives: HVAC Method Statement

Co2 Fire Suppression System Installation Method Statement

This Work Method Statement (WMS) is to describe the method for the CO2 fire suppression system installation & pressure testing for any kind of a project. The aim and /or benefit of complying with this method of statement includes the project specifications & program compliance, Health, Safety, Quality and Environmental company policy compliance. All installation… Read More: Co2 Fire Suppression System Installation Method Statement »

Extractor Ventilation Exhaust Fan Installation Method Statement

This method statement covers the procedure or sequence of installation of Ventilation & Exhaust Fans in different areas and for different types of fans. The procedure is applicable for any kind of HVAC project. Overall project manager and project mechanical engineer are responsible for the implementation of this procedure. The exhaust fans installation shall be… Read More: Extractor Ventilation Exhaust Fan Installation Method Statement »

Method Statement for HVAC Air Balancing and Air Flow Measurement

Table of Content 1. INTRODUCTION 2. PREREQUISITES TO PROCEDURE 2.1 Access / Egress 2.2 Responsibilities / Supervision 2.3 Requirements 2.4 Personal Protective Equipment 3. DESIGN PERAMETERS 3.1 Specification Reference 3.2 Drawing Reference 4. REFERENCE DOCUMENTS 4.1 Relevant Commissioning Codes 5. PRE-COMMISSIONING / PRE START CHECKS 5.1 Static Checks 6. COMMISSIONING / TEST PROCEDURES 6.1 Starting… Read More: Method Statement for HVAC Air Balancing and Air Flow Measurement »

Fan Coil FCU Unit Installation Method Statement

Below is a precise method statement for fan coil unit FCU installation for any kind of project. Project manager is overall responsible for the implementation of this method and all applicable standards, specifications and manufacturer instructions for the FCU installation. Site engineer/ supervisor shall make sure that all necessary documentation work is approved, shop drawings/… Read More: Fan Coil FCU Unit Installation Method Statement »

Water Heater Installation | Geyser Installation Method Statement

This page gives a brief method statement for water heater installation or geyser installation in compliance with the approved design, drawings, approved material submittals and project specification. Prior to installation of Water Heater, the supervisor and foreman will verify and ensure that all the safety requirements have been complied and necessary control measures are in… Read More: Water Heater Installation | Geyser Installation Method Statement »

HVAC Ducting Outlets Grills and Diffusers Installation Method Statement

Below is a precise method statement that covers the installation of HVAC Ducting Outlets i.e. Grills and Diffusers. Scope of work includes all the ductwork for the project covering the outlets as per the approved schedule. Project manager is overall responsible for the control of all related activities including the quality of work and health… Read More: HVAC Ducting Outlets Grills and Diffusers Installation Method Statement »