Category Archives: HVAC Method Statement

Refrigerant Copper Piping Installation Method Statement

The purpose of this mechanical method statement is to identify the requirements/methodology for installation of refrigerant copper piping as per the contract specification, drawings and as per the applicable regulations if any. This method statement is applicable to all activities related to installation of refrigerant copper piping for Ducted Split and Decorative Units. The implementation… Read More: Refrigerant Copper Piping Installation Method Statement »

Method Statement for Drainage & Sewage Works

The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications 0considering safety and quality of the work activities. Scope of work may cover any length of… Read More: Method Statement for Drainage & Sewage Works »

Hydrotest Pipe Pressure Testing Procedure

This mechanical method statement section applies to the hydrostatic testing of new fabricated and installed stainless steel SS pipelines associated with a construction or pipeline project. After completion and approval of all welding, radiography and NDT requirements/ activities the piping system shall be hydrostatically pressure tested. The site supervisor shall obtain relevant safety permits to… Read More: Hydrotest Pipe Pressure Testing Procedure »

Drainage Vacuum System Installation and Testing Method Statement

Before start of drainage system piping installation and testing completeness of the related works and systems shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records. Make sure that all tools/equipment/instruments required are calibrated and having valid certificate. Safe access to work areas shall be provided and shall be… Read More: Drainage Vacuum System Installation and Testing Method Statement »

Method Statement for Air Conditioner Equipment (FCU, AHU, FAHU & Fans) Installation

Below is a precise method statement that describes the steps for the installation of air conditioner equipment in a central AC system like exhaust fans, AHU, FCU and FAHU etc. HVAC equipment installation involves working on height that requires strict health and safety measures, which are briefly explained in below section. Modular Supervisors and foremen… Read More: Method Statement for Air Conditioner Equipment (FCU, AHU, FAHU &… »

HVAC Air Distribution System Duct Work Installation Insulation and Cladding Method of Statement

Purpose of this mechanical procedure is to define the sequence and methodology for all critical installation activity pertaining to HVAC air distribution system i.e. ductworks for any kind of construction project building with contract scope of work, applicable standards and drawings. The scope of work includes AC units with chilled water piping connected with ductworks,… Read More: HVAC Air Distribution System Duct Work Installation Insulation and Cladding… »