Category Archives: HVAC Method Statement

Refrigerant Copper Piping Installation Method Statement

The purpose of this mechanical method statement is to identify the requirements/methodology for installation of refrigerant copper piping as per the contract specification, drawings and as per the applicable regulations if any. This method statement is applicable to all activities related to installation of refrigerant copper piping for Ducted Split and Decorative Units. The implementation… Read More: Refrigerant Copper Piping Installation Method Statement »

Method Statement for Drainage & Sewage Works

The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications 0considering safety and quality of the work activities. Scope of work may cover any length of… Read More: Method Statement for Drainage & Sewage Works »

Hydrotest Pipe Pressure Testing Procedure

This mechanical method statement section applies to the hydrostatic testing of new fabricated and installed stainless steel SS pipelines associated with a construction or pipeline project. After completion and approval of all welding, radiography and NDT requirements/ activities the piping system shall be hydrostatically pressure tested. The site supervisor shall obtain relevant safety permits to… Read More: Hydrotest Pipe Pressure Testing Procedure »

Natural Gas Piping Installation Method Statement

This procedure is applicable to all natural gas pipeline underground installation works at any kind of project and aims to ensure that all works are carried out to comply with the applicable acts, regulations and by laws i.e. Local and international code of Practice for the Installation of Fuel Gas Piping Systems and Appliances, Occupational… Read More: Natural Gas Piping Installation Method Statement »

Sewer System Sewerage Piping Installation & Testing Method Statement

All the piping materials received at site will be inspected, upon receipt on the project site. Any discrepancies / damages should be notified and reported to the supplier for further action. Materials found not suitable for site use will be removed from site immediately. All construction/inspection/testing works shall be carried out in accordance with project… Read More: Sewer System Sewerage Piping Installation & Testing Method Statement »

Drainage Vacuum System Installation and Testing Method Statement

Before start of drainage system piping installation and testing completeness of the related works and systems shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records. Make sure that all tools/equipment/instruments required are calibrated and having valid certificate. Safe access to work areas shall be provided and shall be… Read More: Drainage Vacuum System Installation and Testing Method Statement »