Category Archives: Road Work

Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement

This method statement represents the proposed construction procedure for the bituminous roads, kerbs, tiles and paver block installation activities. It is the overall responsibility of the project manager for road work, to ensure that the site preparation activities and safety requirements are conducted according to the project specifications and approved project safety plan. The method… Read More: Bituminous Roads, Kerbs, Tiles and Paver Block Installation Method Statement »

Road Marking Method Statement

The purpose of this roadwork method statement is to ensure that all road marking and signs are executed safely and in accordance with the contract requirements and that all quality assurance and quality control activities are conducted in a systematic manner, also the road work are inspected and conformance to project specifications and applicable codes… Read More: Road Marking Method Statement »

Road and Transport Works Terms & Definitions

Below are terms, words or expressions used in road works specifications tenders, communications and other project documents. These shall have the meanings hereby assigned to them. Aggregate: Hard mineral elements of construction material mixtures, for example: sand, gravel (crushed or uncrushed) or crushed rock. Anchorage: Anchorage is the device comprising all the components and materials… Read More: Road and Transport Works Terms & Definitions »

Laying of Dense Bituminous Macadam DBM – Road Construction

This method statement covers the laying of Dense Bituminous Macadam (DBM) in 50 to 100 mm thick layers as profile correction course (PCC) on a previously prepared existing concrete surface as per specified lines & grades. The road construction works shall comply the contract agreement, project specifications, relevant drawings and applicable local and international standards.… Read More: Laying of Dense Bituminous Macadam DBM – Road Construction »

Road Maintenance Method Statement Including Cracks Potholes Patches Edge Breaks

Contractor will carry out the road maintenance and construction works in compliance with the technical specification and engineer’s instructions. With the direction and instruction of the client/ consulting engineer, at the designated areas, the motor graders and excavators are used to clear, remove, and dispose all vegetation, silt and grubbing roots, down timber and other… Read More: Road Maintenance Method Statement Including Cracks Potholes Patches Edge Breaks »

Temporary Traffic Management Plan & Method Statement for Construction Project Sites

This method statement describes the overall sequence of the traffic diversions that will be carried out at a construction project site. It also outlines the materials used, machinery and equipment involved for ensuring the works are carried out safely and in compliance with contract requirements. Terms & Definitions Competent Person: For the purpose of the… Read More: Temporary Traffic Management Plan & Method Statement for Construction Project… »