This civil work method statement is prepared to ensure that construction of buildings for the project shall comply on plans specifications and all relevant standard and code requirements in the execution of different work activities to be performed in the construction of
Read More
This civil work method statement shall address the requirements of project site operations applicable for the supply and placing of structural and nonstructural concrete pouring on the construction work project. Following this method of statement will ensure that concrete works activity will
Read More
1. Purpose 2. Scope 3. Definitions 4. Responsibilities 5. Safety 5.1 Machinery and Equipment 5.2 Personal Protective Equipment 5.3 Safety Arrangement during the foundation work 6. Working Method 6.1 Preparing Work 6.2 Survey and Setting out 6.3 Excavation 6.4
Read More
Following equipment and tools may be used as required during Wet Area Water Proofing works. Wire Brushes Soft Brushes Air Compressor Empty containers / drums Stirrer / Rod Paint Brushes Paint rollers Wheel barrow Spatula Other hand tools Waterproof 360 PU (Liquid
Read More
EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 : 2 Nos. Hydraulic Saw Head, HILTI DSTS 30 : 2 Nos. Hydraulic Hoses (set of 6 hoses) : 2 Nos. Remote Control : 2 Nos. Coring Machines HILTI DD250 : 2
Read More