Tag Archives: fire sprinkler system installation

Fire Sprinkler System Installation Method Statement

Below method statement covers the method and procedures for installation of fire fighting sprinkler pipe works inside the building. The method of statement is applicable to all internal fire fighting pipes, riser works and sprinklers. Reference Documents: Approved Drawings. Project Specification. NFPA 13 section 10-2.2. Necessary Tools and Equipment Measuring Tape Grooving Machine Threading Machine… Read More: Fire Sprinkler System Installation Method Statement »

Fire Sprinkler System Installation Testing and Commissioning Method Statement

This procedure covers installation, pressure testing and functional commissioning of firefighting sprinkler system. Method statement covers an integrated system of underground and overhead piping designed in accordance with fire protection engineering standards. This method covers portion of the sprinkler system above ground in a network of specially sized OR hydraulically designed piping installed in a… Read More: Fire Sprinkler System Installation Testing and Commissioning Method Statement »

Fire Sprinkler System Installation Method Statement

This mechanical method statement covers the installation of fire sprinkler system piping network. Procedure defines the method used to ensure the installation has been carried out as per contract requirements and best industry practices. The method statement gives details of how the work will be carried out and how the health and safety issues and… Read More: Fire Sprinkler System Installation Method Statement »