HSE Procedure for Setting Site Compound, Parking and Material Storage

This method statement outlines the procedure and methodology for the site compound set up, including Parking and Material Storage. Typically contracts manager, site agent, foreman and a suitably qualified ecologist is responsible for this activity. Other employees who are directly involved include plant operators, banksman, site supervisor and general operatives. Necessary Plant & Equipment 20… Read More: HSE Procedure for Setting Site Compound, Parking and Material Storage »

Project Landscaping Automatic Irrigation Works Method Statement

The objectives of this method statement is to briefly describe the major activities and set inspection milestones for irrigation system installation. Purpose of this procedure is to establish general guidelines addressing major requirements that are necessary to ensure that irrigation work conforms to the project drawings, design and specifications. This method statement explains and covers… Read More: Project Landscaping Automatic Irrigation Works Method Statement »

Project Progress Reporting & Monitoring Procedure

This project management procedure describes the activities related to project progress report and progress control methods and Reports to enable effective monitoring of a project. Progress Measurement Procedure Progress measurements shall be undertaken on a regular basis of all works in progress. The period of measurement will be determined by the Project Director / Project… Read More: Project Progress Reporting & Monitoring Procedure »

GRP / FRP Pipe Installation Method Statement

This method statement covers the procedure involved in handling and installation of underground GRP/FRP piping in a trench. The purpose is intended to assist the client, customer/ installer in understanding the requirements for the successful GRP pipe handling and installation. The recommendations given in this plumbing method statement are easy to follow and implement. This… Read More: GRP / FRP Pipe Installation Method Statement »

PROJECT MANAGEMENT RESPONSIBILITIES FOR SPECIALIST LIGHTING CONSULTANT

PROJECT MANAGEMENT RESPONSIBILITIES FOR SPECIALIST LIGHTING CONSULTANT FOR TYPICAL OFFICE, HOTEL & RESIDENTIAL TOWER PROJECTS. HOTEL TOWER INTERIOR LIGHTING – BASEMENT Discotheque (architectural lighting). Public Washrooms. Common Circulation areas between Disco & Washrooms. Entrance to Nightclub at Level B1. Staircase from ground to Level B2. GROUND FLOOR Both Entrance lobby’s including Grand Staircase Lobby bar. Typical lift… Read More: PROJECT MANAGEMENT RESPONSIBILITIES FOR SPECIALIST LIGHTING CONSULTANT »

Steel Structure Fabrication Method Statement

Propose of this method statement is to describe the sequence of activities which will be followed to execute the steel structure fabrication works, including unloading of the raw materials and loading of fabricated materials to dispatch at project site. Below is list of plant machinery and necessary equipment for doing the fabrication of steel structure… Read More: Steel Structure Fabrication Method Statement »