Temporary Traffic Management Plan & Method Statement for Construction Project Sites

This method statement describes the overall sequence of the traffic diversions that will be carried out at a construction project site. It also outlines the materials used, machinery and equipment involved for ensuring the works are carried out safely and in compliance with contract requirements. Terms & Definitions Competent Person: For the purpose of the… Read More: Temporary Traffic Management Plan & Method Statement for Construction Project… »

Underground Drainage Piping Installation Method Statement

This Method Statement covers the installation of uPVC and HDPE pipes for use with the underground and substructure drainage piping systems. Procedure defines the method used to ensure the underground drainage pipework installation has been carried out as per technical specifications and best commercial and engineering practices. Roles & Responsibilities Project manager will be overall… Read More: Underground Drainage Piping Installation Method Statement »

Project HSE Training, Awareness and Competence Procedure

Project safety training for all project personnel is completed on the projects in accordance with the requirements documented in this hse training procedure as identified below. The Management of Health and Safety at work places a duty on every company to: 1. Take into account employees capabilities as regards Health and safety, 2. Provide adequate… Read More: Project HSE Training, Awareness and Competence Procedure »

Mechanical Equipment Inspection Checklists During Construction Project Lifecycle

Below is a comprehensive list of different inspection requirements for receiving storing and installation of different mechanical/HVAC equipment’s. These inspections must be completed throughout the project at its different stages i.e. delivery, storage, installation & pre-commissioning before the functional testing occurs. Delivery Inspections Once the equipment i.e. FCU arrives at the site, usually delivered by… Read More: Mechanical Equipment Inspection Checklists During Construction Project Lifecycle »

Specific Gravity and Water Absorption Aggregate Testing Method

The purpose of this procedure is to determine the specific gravity and water absorption of given sample of aggregates for road works. Specific gravity of an aggregate is considered to be a measure of strength or quality of the material. Stones having low specific gravity are generally weaker than those with higher specific gravity values.… Read More: Specific Gravity and Water Absorption Aggregate Testing Method »

Method Statement for Building Construction Civil Engineering Project

Below is best construction method statement that also covers the quality planning at construction site of civil engineering project. Below is list of activities that are covered in this civil contractor method of statement. Excavation work, including soil excavation, soil disposal, backfill and underground water disposal to ensure quality of foundation work. Formwork, including all… Read More: Method Statement for Building Construction Civil Engineering Project »