Tag Archives: Attic Slab

Method Statement For Installation Of Steel Structure For Attic Slab

Following equipment shall be arranged before starting the work. Lifting Equipment: Chain block / Lever Block is used to lifting the beams at the installation area. Usually use to help workers to lift the beams at low level height before fixing the connection bolts the same also for aligning the connection of the beams. Rotating & Power… Read More: Method Statement For Installation Of Steel Structure For Attic Slab »