Author Archives: Web Master

Civil Method Statement For Wet Area Water Proofing Works

Following equipment and tools may be used as required during Wet Area Water Proofing works. Wire Brushes Soft Brushes Air Compressor Empty containers / drums Stirrer / Rod Paint Brushes Paint rollers Wheel barrow Spatula Other hand tools Waterproof 360 PU (Liquid applied Polyurethane Waterproofing Membrane) WATER PROOFING PROCEDURE Storage and Handling of Materials: Materials… Read More: Civil Method Statement For Wet Area Water Proofing Works »

Earned Value Management – EVM Analysis During Design

Earned Value Management (EVM) is a project management technique for measuring project performance and progress in an objective manner. EVM has the ability to combine measurements of scope, schedule, and cost in a single integrated system. Earned Value Management is notable for its ability to provide accurate forecasts of project performance problems. Early EVM research… Read More: Earned Value Management – EVM Analysis During Design »

Method Statement For Fixing & Installation Of Stone Flooring Marble / Granite Works

This method statement provides the control sequence and installation methodology that will be used for supply, laying and fixing or installation of Stone Flooring (Marble/Granite Flooring), Finishes shown on the approved Shop Drawings or finishing schedules in compliance with the Project Specification. The following equipment and tools shall be provided with the necessary numbers to… Read More: Method Statement For Fixing & Installation Of Stone Flooring Marble… »

Project Management Monthly Reporting Procedure & Formats

1. Purpose The purpose of this procedure is to provide a standard monthly project report formats and guidelines, which facilitate the accurate and regular reporting of a project’s progress and status to senior management. The contents of the Monthly Project Report represent the minimum reporting requirements. 2. Scope This procedure is applicable for all projects… Read More: Project Management Monthly Reporting Procedure & Formats »

Method Statement For Erection and Dismantling Of Slab Formwork For Water Tanks

The aim of this Method Statement is to provide and maintain effective quality control procedures and to execute the construction work in compliance to standard and good practice at all stages and activities for the Erection & Dismantling of the Slab Formwork for Water Tanks. Following equipment’s and tools will be used as required during the… Read More: Method Statement For Erection and Dismantling Of Slab Formwork For… »

Structural Steel Work, Roofing System, Wall Cladding & Steel Decking Design Requirements

This article covers the design of connections and the fabrication, supply and erection of structural steel work, roofing system, wall cladding and steel decking. Below is a list of applicable standards and codes: BS 7668:1994, BS EN 10113, BS EN 10155, BS EN 10210; grade 43C: Structural Steel including sections facricated from steel BS4: Structural steel sections. … Read More: Structural Steel Work, Roofing System, Wall Cladding & Steel Decking… »