General Requirements for Dewatering – Excavations and Pits

This document specification deals with the general requirements for the Dewatering to keep excavations and pits dry, and to prevent damage to the buildings due to hydrostatic pressure. Work of this section shall be considered as Specialist Work and to be conducted by specialist party only. The applicable standard for this work is BS 9301.… Read More: General Requirements for Dewatering – Excavations and Pits »

Formworks and Accessories Requirements for Concrete Casting

Formwork and falsework shall be so constructed that they will support the loads imposed on them by the fresh concrete together with additional stresses imposed by vibrating equipment and by construction traffic, so that after the concrete has hardened the formed faces shall be in the positions shown on the drawings within the tolerances set… Read More: Formworks and Accessories Requirements for Concrete Casting »

Safe Work Method Statement & Risk Assessment for Excavation and Trenching

This safe work method statement SWMS details how specific risks associated with excavation, trenching and the location of underground services are to be managed and controlled. It outlines the common risks and dangers associated with this work and how to best control them. The control measures listed in this SWMS must be implemented on site.… Read More: Safe Work Method Statement & Risk Assessment for Excavation and… »

Secretary Job Description

Reporting to : Linked with : Management Level Head Office Project Contractors Level of Authority None Level of Contacts All Project Staff Head Office Consultants and Clients Main Contractors, Subcontractors and Suppliers  Basic Function, Scope, Duties and Responsibilities Carry out and maintain filing system Typing all required correspondences Preparing minutes of meeting Arranging meetings with… Read More: Secretary Job Description »

Commercial Management Procedure for Project Cash flow and Flexible Budget Reporting

1.0 Purpose To set out a standard methodology for the forecasting and reporting of project revenue, project costs, net cash position and monthly profit & loss to facilitate divisional and overall company accounts management. 2.0 Scope This procedure is applicable for all projects. 3.0 References Cost Codes & Budget Management Project Reporting Pack Subcontractor Liability… Read More: Commercial Management Procedure for Project Cash flow and Flexible Budget… »

Civil Method Statement For Wet Area Water Proofing Works

Following equipment and tools may be used as required during Wet Area Water Proofing works. Wire Brushes Soft Brushes Air Compressor Empty containers / drums Stirrer / Rod Paint Brushes Paint rollers Wheel barrow Spatula Other hand tools Waterproof 360 PU (Liquid applied Polyurethane Waterproofing Membrane) WATER PROOFING PROCEDURE Storage and Handling of Materials: Materials… Read More: Civil Method Statement For Wet Area Water Proofing Works »