Skip to content
Project Management 123

Project Management Resources - Editable Documents

  • Home
  • Download Editable Documents
  • Quality Plan
  • HSE Plan
  • Maintenance
  • Contact Us
  • Cart
    • My Account
  • Privacy
    • Disclaimer

Pile Concreting

  • Home
  • Pile Concreting
Concrete piling equirements and load test
Posted inProject Specifications

Concrete Pile Works and Load Testing Requirements

All materials to be used for the piling concrete works shall meet the requirements as specified under relevant specifications of a project, and any cement to be used for concrete piles shall be a suitable combination of GGBFS,  satisfying ASTM C989, CEM II to BS EN 197-1:200 or BS 4246-1996…
Read More
Tags: Drilling Operation, Pile Concreting, Pile Testing, Piling Foundation, Routine Test, Temporary Casing
download editable project documents
Recent Posts
  • General Contractor Building Construction Method for Civil Works
  • Fire Hose Reel & Cabinets Testing and Commissioning Method Statement For Fire Fighting System
  • Electrical Installation Method Statement for HV Panels
  • Method Statement for Connection of Drainage Pipe Line of Building With Main Line
  • Method Statement for Construction of Non Disruptive Road Crossing NDRC by HDD Drilling Method
  • Workplace House Keeping Method for Site Contamination Control
  • Piping Insulation and Jacketing Method Statement
  • Site Preparation and Mobilization Method Statement
  • Method Statement for Piling Works at Construction Project
  • Construction Method of Statement for Installation of Above Ground Drainage System
Document Categories
  • Civil Method Statements
  • Electrical Engineering
  • Electrical Method Statements
  • Job Description
  • Job Safety Analysis
  • Mechanical Method Statement
  • Project Management
  • Project Management Procedures
  • Project Specifications
  • Project Templates
  • Risk Assessment
Editable Documents Categories
  • Civil Method Statements
  • Electrical Method Statements
  • Mechanical Method Statements
  • Discounted Method Statement Packages
  • Plumbing Method Statements
  • HVAC Method Statements
  • Project Plans
  • Testing and Commissioning Method Statements
  • Project Management
  • Commercial & Finance Management Procedures
  • Corporate Management Procedures
  • HSE Procedures
  • Construction Risk Assessment
  • Quality Management Procedures
  • Fire Fighting Method Statements
Meta
  • Log in
  • Entries feed
  • Comments feed
  • WordPress.org
Most Popular
Copyright 2021 — Project Management 123. All rights reserved.
Scroll to Top
error: Content is protected !!