Method statement for Receiving and Incoming Material Inspection On Construction Project Site

Below is a method statement which is helpful for defining the procedure for receiving and inspecting incoming materials on the project construction site including the concrete inspection. The purpose of this method statement is is to define the procedure for receiving and inspection of purchased materials to the site. The incoming material inspection method covers:… Read More: Method statement for Receiving and Incoming Material Inspection On Construction… »

Risk Management Process and Plan for Construction Project – HSE

Below is a steps wise risk management process that consists of hazard identification, risk assessment, risk control, analysis and improvement. The overall responsibility for the implementation of this procedure is with the project manager and safety and other department heads. Below are three flow charts that are helpful to understand the process of health, safety… Read More: Risk Management Process and Plan for Construction Project – HSE »

Reinforcing Bars Fabrication and Installation Method Statement

1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0 SCOPE: This method statement outlines the procedures to be followed in installation of reinforcing… Read More: Reinforcing Bars Fabrication and Installation Method Statement »

Method Statement For Supply & Installation of EOT Cranes

Below is a detailed method statement for Installation of EOT Overhead Gantry Crane. EOT crane installation shall be in accordance with the project requirements and crane manufacturer installation instructions. This method statement also describes the installation of overhead gantry crane for the pump rooms, cooling plants and maintenance and erection workshops etc. Project manager is… Read More: Method Statement For Supply & Installation of EOT Cranes »

Method Statement Template for Construction of Temporary Causeway & Jetty

Table of Contents 1.0      Introduction 2.0      Purpose and Scope 3.0      Document Control 4.0      Reference Documents 5.0      Definitions, Terms and Abbreviations 6.0      Responsibility 7.0      Materials and Equipment 8.0      Resources 9.0      Methodology / Procedure 10.0    Permit 11.0    Quality Control 12.0    Health, Safety and Environment 1. Introduction A temporary Jetty shall be built at the project to facilitate… Read More: Method Statement Template for Construction of Temporary Causeway & Jetty »

PROJECT RESPONSIBILITIES FOR THE CLIENT & ENGINEER

CLIENT PROJECT RESPONSIBILITIES  The Clients’ duties and responsibilities include: Obtain and provide the Project Manager with all necessary information (including reports and other relevant documentation) in its possession which relates to the Project execution and control. Provide the Project Manager in timely manner with all other information which the Project Manager may reasonably request. Give… Read More: PROJECT RESPONSIBILITIES FOR THE CLIENT & ENGINEER »