Concrete Pile Works and Load Testing Requirements

All materials to be used for the piling concrete works shall meet the requirements as specified under relevant specifications of a project, and any cement to be used for concrete piles shall be a suitable combination of GGBFS,  satisfying ASTM C989, CEM II to BS EN 197-1:200 or BS 4246-1996 & OPC type I to… Read More: Concrete Pile Works and Load Testing Requirements »

Method Statement For Water Proofing Works

Purpose of the method statement The purpose of this method statement is to outline the sequences and methods of works intended to be used for the execution of substructure waterproofing of building basement raft slab &  basement walls. The Contractor reserves the right to adapt the methods of execution as contained in this document, modification to… Read More: Method Statement For Water Proofing Works »

Project Audit & Review Checklist in Editable Document Format

The following provides a detailed checklist to assist in reviewing the health of a project at pre and post implementation stage. The full documents is available to download, just keep reading and download if you like. 1. Project Planning 1.1 Does the project have a formal Project Plan? 1.2 Are the key elements of a… Read More: Project Audit & Review Checklist in Editable Document Format »

Requirements for Road Marking Paint For Pavements centreline, edge lines, cross walks etc.

Permanent Markings for Concrete Surfaces Two part epoxide resin paint shall be used for marking concrete surfaces. The paint shall give a matt or semi-gloss finish and is to be formulated on a catalyst cured epoxide resin base. The material should be fuel resistant. The paint shall consist of non-volatile constituents and solvents of which… Read More: Requirements for Road Marking Paint For Pavements centreline, edge lines,… »

Project Commercial Management Procedure for Insurance Policies

1.0 Purpose of Procedure To ensure that: All aspects of project insurances are appropriately arranged and administered to protect the Company’s best interests and to meet acceptable risk profile including (but not limited to) Construction All Risk (CAR), Third Party Public Liability (TPL), Professional Indemnity (PI) and Difference In Conditions (DIC) policies where appropriate. Subcontractors,… Read More: Project Commercial Management Procedure for Insurance Policies »

Hydroseeding Mix Application Method Statement

This procedure is prepared to define and establish the method statement of Hydroseeding Mix application. Project manager is responsible to ensure that method statement comply with client requirements and its submission and approval as well. Construction manager is responsible to monitor implementation of this method statement and ensure the works are carried out as per… Read More: Hydroseeding Mix Application Method Statement »