Metallic Piping Fabrication and Installation Method Statement & Job Safety Analysis

This method statement covers the sequence of activities for fabrication, erection and installation procedure for Metallic Piping. The method is useful for carbon steels, alloy steels, stainless steels and nickel alloys systems. Procedure will help to ensure the compliance of piping works with the contractual applications and HSE requirements. Following equipment’s and tools shall be… Read More: Metallic Piping Fabrication and Installation Method Statement & Job Safety… »

PROJECT RESPONSIBILITIES OF THE INTERIOR DESIGNER AT DIFFERENT STAGES

PROJECT RESPONSIBILITIES OF THE INTERIOR DESIGNER AT DIFFERENT STAGES PHASE 1 – CONCEPT DESIGN: The I.D Consultant will initially: Analyze the concept space planning with the Engineers and review the architectural layout to enhance and optimize the interior planning, circulation and special relationship between the key facilities. Agree with the Clients Representative all preliminary information necessary… Read More: PROJECT RESPONSIBILITIES OF THE INTERIOR DESIGNER AT DIFFERENT STAGES »

Method Statement for Installation of Central Battery System

The following procedure will be followed for installation of Central Battery system and can be customized as per the specific needs for different projects. Emergency lighting battery system shall be of modular construction with all modules being plug in type encapsulated design. The outgoing circuits shall be fed through changeover modules. Each module shall be capable… Read More: Method Statement for Installation of Central Battery System »

Method Statement for Installation of Aluminum Glazed Windows, Doors & Louvers

Required Tools for installation of Aluminum Glazed Windows, Doors & Louvers: Hand Tools Drill Machine Glass suckers Sealant applicator Cutting saw Lifting belt Cradle/Scaffolds Tower/Mobile Crane INSTALLATION PROCEDURE FOR DOORS, WINDOWS & LOUVERS: Ensure all opening are as per the approved shop drawings. Cleaning of the dust on masonry opening of doors & windows with the… Read More: Method Statement for Installation of Aluminum Glazed Windows, Doors &… »

PROJECT MANAGEMENT RESPONSIBILITIES OF THE ACOUSTIC NOISE CONTROL SPECIALIST CONSULTANT

Consultant has reviewed and is familiar with all drawings and equipment proposed to be furnished on the project.  The following analysis will be conducted: Noise Criteria: At the outset of our work, CONSULTANT will review the latest relevant design documents and determine appropriate acoustical criteria. Where these are not defined in the Building Specification, CONSULTANT… Read More: PROJECT MANAGEMENT RESPONSIBILITIES OF THE ACOUSTIC NOISE CONTROL SPECIALIST CONSULTANT »

Standard Requirements for Curtain Walling System

This pages mentions requirements for the provision of design, manufacture, supply, delivery, storage, assembly, fixing, installation, testing and commissioning of curtain walling system and all windows and glazed spandrels The Contractor will be required to produce full working drawings and details showing the construction, fabrication or manufacture, assembly and installation of the curtain wall system.… Read More: Standard Requirements for Curtain Walling System »