Author Archives: Web Master

Method Statement of Brickworks

This is a precise method statement that can help you to assure that brickworks are installed properly and inspected and confirmed in accordance with drawings, specification and good working practice. Following tools and materials shall be available before start of work. Brick Hammer Trowel set Cement edgers Brick jointer Procedure of Brickwork The average compressive… Read More: Method Statement of Brickworks »

Project Life Cycle HSE Management Activities – Civil Engineering & Infrastructure Work

This Method Statement describes the hse management arrangements and systems of work to be adopted by Company during civil engineering and Infrastructure groundwork operations. The document, with its appended risk assessment, will suffice for the majority of works undertaken by the company but will require alterations or additions for certain projects. Where additions and amendments… Read More: Project Life Cycle HSE Management Activities – Civil Engineering &… »

Reinforcing Bars Fabrication and Installation Method Statement

1.0 PURPOSE: To ensure that the installation of reinforcing bars are executed safely and in accordance with the contract requirements and that all quality assurance/ control activities are conducted in a systematic manner, works are inspected and conformance is verified and documented. 2.0 SCOPE: This method statement outlines the procedures to be followed in installation of reinforcing… Read More: Reinforcing Bars Fabrication and Installation Method Statement »

Method Statement For Supply & Installation of EOT Cranes

Below is a detailed method statement for Installation of EOT Overhead Gantry Crane. EOT crane installation shall be in accordance with the project requirements and crane manufacturer installation instructions. This method statement also describes the installation of overhead gantry crane for the pump rooms, cooling plants and maintenance and erection workshops etc. Project manager is… Read More: Method Statement For Supply & Installation of EOT Cranes »

Method Statement Template for Construction of Temporary Causeway & Jetty

Table of Contents 1.0      Introduction 2.0      Purpose and Scope 3.0      Document Control 4.0      Reference Documents 5.0      Definitions, Terms and Abbreviations 6.0      Responsibility 7.0      Materials and Equipment 8.0      Resources 9.0      Methodology / Procedure 10.0    Permit 11.0    Quality Control 12.0    Health, Safety and Environment 1. Introduction A temporary Jetty shall be built at the project to facilitate… Read More: Method Statement Template for Construction of Temporary Causeway & Jetty »

PROJECT RESPONSIBILITIES FOR THE CLIENT & ENGINEER

CLIENT PROJECT RESPONSIBILITIES  The Clients’ duties and responsibilities include: Obtain and provide the Project Manager with all necessary information (including reports and other relevant documentation) in its possession which relates to the Project execution and control. Provide the Project Manager in timely manner with all other information which the Project Manager may reasonably request. Give… Read More: PROJECT RESPONSIBILITIES FOR THE CLIENT & ENGINEER »