Method Statement For Supply & Installation of EOT Cranes

Below is a detailed method statement for Installation of EOT Overhead Gantry Crane. EOT crane installation shall be in accordance with the project requirements and crane manufacturer installation instructions. This method statement also describes the installation of overhead gantry crane for the pump rooms, cooling plants and maintenance and erection workshops etc. Project manager is… Read More: Method Statement For Supply & Installation of EOT Cranes »

Method Statement Template for Construction of Temporary Causeway & Jetty

Table of Contents 1.0      Introduction 2.0      Purpose and Scope 3.0      Document Control 4.0      Reference Documents 5.0      Definitions, Terms and Abbreviations 6.0      Responsibility 7.0      Materials and Equipment 8.0      Resources 9.0      Methodology / Procedure 10.0    Permit 11.0    Quality Control 12.0    Health, Safety and Environment 1. Introduction A temporary Jetty shall be built at the project to facilitate… Read More: Method Statement Template for Construction of Temporary Causeway & Jetty »

PROJECT RESPONSIBILITIES FOR THE CLIENT & ENGINEER

CLIENT PROJECT RESPONSIBILITIES  The Clients’ duties and responsibilities include: Obtain and provide the Project Manager with all necessary information (including reports and other relevant documentation) in its possession which relates to the Project execution and control. Provide the Project Manager in timely manner with all other information which the Project Manager may reasonably request. Give… Read More: PROJECT RESPONSIBILITIES FOR THE CLIENT & ENGINEER »

Method Statement For Removal Of Concrete Brackets Earlier Provided For Struts

EQUIPMENT / MACHINERY REQUIRED: Hydraulic Power Pack, HILTI DLP 30 :  2 Nos. Hydraulic Saw Head, HILTI DSTS 30 :  2 Nos. Hydraulic Hoses (set of 6 hoses) :  2 Nos. Remote Control :  2 Nos. Coring Machines HILTI DD250 :  2 Nos. Drilling Machines HILTI TE 2 :  2 Nos. Diamond Wire :  1… Read More: Method Statement For Removal Of Concrete Brackets Earlier Provided For… »

Project Completion and Handover Procedure

The purpose of the procedure is to ensure that key issues during the Project Completion stage of the construction cycle are administered in accordance with the Main Contract, including: – Taking Over Certificates – Defects Liability – Final Payment Application/Certificates For the administration of Monthly Statements/Applications and Certificates refer to procedure for Contractor’s Monthly Statements.… Read More: Project Completion and Handover Procedure »

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT

PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT All required design works are to be carried out to internationally recognized standards, in compliance with local codes and regulations and to the owner hotel operator’s requirements incorporating the latest standards and technology applicable to this type of development. IT & AUDIO-VISUAL SCOPE OF WORK… Read More: PROJECT MANAGEMENT RESPONSIBILITIES FOR THE SPECIALIST AUDIO VISUAL AV CONSULTANT »