Category Archives: Health & Safety

Quality & HSE Management System Manual Structure

Below is Table of content for a typical Management System Manual which can be used for developing the manuals for quality, safety or HSE systems. 1. PURPOSE & SCOPE 1.1.       Vision, Mission and Values 1.2.       Our Core Values 1.3.       Our Stakeholders 1.4.       Outline Organisation Structure – Appendix B 1.5.       Policy Statement –… Read More: Quality & HSE Management System Manual Structure »

Job Safety Analysis For Screeding Civil Works & Download Link

Activity: Use of electrical equipment’s Hazards & Risks: Electrical Shock, Cables management issues, Personal Injury Control Measures: – Fire exit routes / Muster points shall be properly indicated by installation of signs. – Working areas shall be barricaded (only authorized personnel are allowed to enter). -Electrical Hand tools will be inspected before start the job… Read More: Job Safety Analysis For Screeding Civil Works & Download Link »

Construction Noise Control Measures, Plan and Procedure

This health and safety instruction provides information on the noise hazards and control measures regarding noise in the workplace with the view to prevent industrial hearing loss. The safety procedure is applicable for all kind of projects. Additional control measures may be required depending on project and country local legal occupational health and safety requirements… Read More: Construction Noise Control Measures, Plan and Procedure »