Category Archives: Quality & Safety Management

Job Description of Technical Department Manager Civil Construction Company

Lead the department activities related to projects and corporate office / head office. Raise suggestions to improve the system of working within the project and the company. Follow the relevant procedures of the quality management system. Raise NCR to the non-conforming procedures and practices in the department. Receive all the contract documents i.e. Contract Conditions… Read More: Job Description of Technical Department Manager Civil Construction Company »

Toolbox Talk Topics for 19 Activities

Below we have listed 19 toolbox talk topics with briefing which should take place during the daily safety meeting. Below is table of content which is covered in this post about the safety meeting topics. Sun Safety Work at height Mobile scaffolds Portable electric equipment Coshh PPE-Head PPE-Hand PPE-Foot PPE-Hearing PPE-Eye Accident reporting Fire Precautions… Read More: Toolbox Talk Topics for 19 Activities »

Construction Project Site Clearance Method

The purpose of this method is to give guidance for the clearing operation for all site areas where clearing is required. Instruction applies to all areas and is not limited to clearing for dump areas, haul roads and pits. This safework instruction takes into account all aspects of this activity including operation, production, safety, environment… Read More: Construction Project Site Clearance Method »

Demolition Method Statement for Covered Walkway

Below is a brief method statement that is for the demolition of existing covered walkway. Existing structure shall be removed completely, which is a cantilevered structure supported by steel elements and covered with roof tiles. Below is list of equipment for demolition works: Skip Tank Oxygen Acetylene cutting torch Electric Concrete breaker Mini- excavator Preparatory… Read More: Demolition Method Statement for Covered Walkway »

Chilled Water Piping Installation Pressure Testing & Insulation Method Statement

This mechanical method statement covers the nature and type of work for the installation of chilled water CHW piping and Accessories in the project building and the frequency on which the inspections are to be carried out. The method also covers the installation and inspection of Chilled Water Piping including Accessories. All the materials delivered… Read More: Chilled Water Piping Installation Pressure Testing & Insulation Method Statement »

Batching Plant Best Practices for Batching of Concrete

The scope of this procedure covers best practices and checks for carrying out prior to and during the site batching of concrete. Checks prior to commencement of concrete batching activity: Basic constituents of concrete viz. cement, coarse and fine aggregates shall comply with the contract specifications. In case of large projects and where specified, a… Read More: Batching Plant Best Practices for Batching of Concrete »