Category Archives: Quality & Safety Management

Safe Evacuation Procedure in Electrical Emergency Situation

This procedure is designed to carry out a safe evacuation of operatives from electrical emergency situation which may happen during the energization of the switchgear/DB’ s in a construction project. The special conditions of working on a live system makes it vital that the work should be planned in detail and risk assessments/ JSEA’s made… Read More: Safe Evacuation Procedure in Electrical Emergency Situation »

Boom Truck Operators Instructions on Construction Projects

Below standard work instruction addresses the training of new boom truck operators including the refresher awareness and training of experienced operator. This instruction applies to all operators of boom trucks on construction project sites. All Boom Truck operators must hold a valid license before operating the truck at project sites. Also as an additional safety… Read More: Boom Truck Operators Instructions on Construction Projects »

Oil Storage Tank Fabrication Welding and Erection Method Statement

This tank fabrication method statement or procedure shall supplement the requirements of API 650 10th edition for construction, shop fabrications, field fabrications, welding and erection of oil storage tank for a project. In general all recommendations and suggestions advised in HSE Plan. shall be strictly adhered by all Personnel working at field and fabrication yard… Read More: Oil Storage Tank Fabrication Welding and Erection Method Statement »

Construction Quality Control Procedure for Excavation Earth Work and Back Filling (Foundations)

ACTION VERIFY  1.0     Scope This procedure provides a standardized framework for the control of excavation, earthwork and filling to ensure compliance with conditions of contract and contract specifications. 2.0     Procedure All excavation, earthwork and filling will be carried out in Project Director/ accordance with the specification detailed in the project contract documentation. In any circumstances… Read More: Construction Quality Control Procedure for Excavation Earth Work and Back… »

Occupational Health and Safety HSE Accidents and Incidents Reporting and Investigation Procedure

This procedure describes the requirements on the notification, classification and reporting of all HSE accidents and incidents in order to ensure that notification and reporting of all accidents, incidents, diseases and dangerous occurrences is conducted in accordance with the requirement of the law and company safety reporting system. Accident Investigation is a “tool to improve… Read More: Occupational Health and Safety HSE Accidents and Incidents Reporting and… »

As Built Drawing and Documentation Project Management Procedure

This as built procedure describes the requirements for preparation of as built drawing and other project as build documentation. The purpose of this procedure is to ensure that variations from the original dimensions, design intent or materials shown on the drawings, specifications, or other documents are appropriately recorded for the purpose of producing accurate as… Read More: As Built Drawing and Documentation Project Management Procedure »