Requirements for Road Marking Paint For Pavements centreline, edge lines, cross walks etc.

Permanent Markings for Concrete Surfaces Two part epoxide resin paint shall be used for marking concrete surfaces. The paint shall give a matt or semi-gloss finish and is to be formulated on a catalyst cured epoxide resin base. The material should be fuel resistant. The paint shall consist of non-volatile constituents and solvents of which… Read More: Requirements for Road Marking Paint For Pavements centreline, edge lines,… »

Project Commercial Management Procedure for Insurance Policies

1.0 Purpose of Procedure To ensure that: All aspects of project insurances are appropriately arranged and administered to protect the Company’s best interests and to meet acceptable risk profile including (but not limited to) Construction All Risk (CAR), Third Party Public Liability (TPL), Professional Indemnity (PI) and Difference In Conditions (DIC) policies where appropriate. Subcontractors,… Read More: Project Commercial Management Procedure for Insurance Policies »

Hydroseeding Mix Application Method Statement

This procedure is prepared to define and establish the method statement of Hydroseeding Mix application. Project manager is responsible to ensure that method statement comply with client requirements and its submission and approval as well. Construction manager is responsible to monitor implementation of this method statement and ensure the works are carried out as per… Read More: Hydroseeding Mix Application Method Statement »

General Requirements for Dewatering – Excavations and Pits

This document specification deals with the general requirements for the Dewatering to keep excavations and pits dry, and to prevent damage to the buildings due to hydrostatic pressure. Work of this section shall be considered as Specialist Work and to be conducted by specialist party only. The applicable standard for this work is BS 9301.… Read More: General Requirements for Dewatering – Excavations and Pits »

Fire Sprinkler System Installation Method Statement

Below method statement covers the method and procedures for installation of fire fighting sprinkler pipe works inside the building. The method of statement is applicable to all internal fire fighting pipes, riser works and sprinklers. Reference Documents: Approved Drawings. Project Specification. NFPA 13 section 10-2.2. Necessary Tools and Equipment Measuring Tape Grooving Machine Threading Machine… Read More: Fire Sprinkler System Installation Method Statement »

Formworks and Accessories Requirements for Concrete Casting

Formwork and falsework shall be so constructed that they will support the loads imposed on them by the fresh concrete together with additional stresses imposed by vibrating equipment and by construction traffic, so that after the concrete has hardened the formed faces shall be in the positions shown on the drawings within the tolerances set… Read More: Formworks and Accessories Requirements for Concrete Casting »