Method Statement For Screeds/Topping Operation Above Water Proofing in Toilet, Roof Slab and Raft Slab

Method Statement For Screeds/Topping Operation Above Water Proofing in Toilet, Roof Slab and Raft Slab

SCOPE This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. This also covers the screeding operation below tiling works in concrete slabs wherever necessary. This procedure shall be read in conjunction with contract specification for screeding works wherever…
Project Close Out Report – Template

Project Close Out Report – Template

  Were the project objectives (expected outcomes) Accomplished? Explanation if required Were all Deliverable submitted and accepted? Explanation if required Did the Client/Engineer verify that all deliverable met the requirements? Explanation if required Have all subcontracts been closed? Explanation if required Have all final payments been made? (i.e., invoices paid) Explanation if required Have all the project…