2019
Oct
4

General Civil Method Statement For Foundations Construction

1. Purpose 2. Scope 3. Definitions 4. Responsibilities 5. Safety 5.1 Machinery and Equipment 5.2 Personal Protective Equipment 5.3 Safety Arrangement during the foundation work 6. Working Method 6.1       Preparing Work 6.2        Survey and Setting out 6.3       Excavation 6.4

2019
Sep
7

Project Management Procedure for Managing Provisional Sum and Nominated Subcontractors

1. Purpose The purpose of this contract commercial management procedure is to establish the correct administration for the process of Provisional Sums and Nominated Subcontractors for the project. 2. Scope This procedure is applicable for all projects. 3. References Subcontractor and Major

2019
Jul
31

Method Statement for Formwork Reinforcement Bars and Ready Mix Concrete Work

This method statement covers the scope of work including the placement of formwork, reinforcement bars and ready mixed concrete. Arrange following equipment before start of the work: Batching Plants 1-2 Mobile Concrete Pumps 1-4 Truck-mixers 1-8 Air Compressor 1-3 Mobile Water Tank

2019
Jul
15

Project Life Cycle HSE Management Activities – Civil Engineering & Infrastructure Work

This Method Statement describes the hse management arrangements and systems of work to be adopted by Company during civil engineering and Infrastructure groundwork operations. The document, with its appended risk assessment, will suffice for the majority of works undertaken by the company