Plastering Civil Works Method Statement

Plastering Civil Works Method Statement

The necessary equipment/tools involved in plastering works are listed below. Plastering machine with silo system Tyrolene machine for rush coat Hilti Gun Mechanical mixer as required Spray machine or Hand sprayer as required Scabbler / Chipping hammer Hand tools (hand shovel, trowel, wooden float, aluminum straight edge, etc.) Material Handler…
Method Statement For Installation Of Ceramic, Porcelain & Agglomerate Tiling Works

Method Statement For Installation Of Ceramic, Porcelain & Agglomerate Tiling Works

Below is step wise method s statement for Installation Of Ceramic, Porcelain & Agglomerate Tiling Works. Following Equipment shall be arranged: Drum mixer Grinder/saw or wet diamond table masonry cutter Aluminum straight edge Trowel Plumb Spirit level Wheel barrow Hand Shovel Water tank Right Angle Rubber mallet and other Hand…
Method Statement For Screeds/Topping Operation Above Water Proofing in Toilet, Roof Slab and Raft Slab

Method Statement For Screeds/Topping Operation Above Water Proofing in Toilet, Roof Slab and Raft Slab

SCOPE This method statement covers the detailed procedure to be followed for screeds/topping operation above water proofing in toilet, roof slab and raft slab. This also covers the screeding operation below tiling works in concrete slabs wherever necessary. This procedure shall be read in conjunction with contract specification for screeding works wherever…
Project Close Out Report – Template

Project Close Out Report – Template

  Were the project objectives (expected outcomes) Accomplished? Explanation if required Were all Deliverable submitted and accepted? Explanation if required Did the Client/Engineer verify that all deliverable met the requirements? Explanation if required Have all subcontracts been closed? Explanation if required Have all final payments been made? (i.e., invoices paid) Explanation if required Have all the project…