Method Statement for Water Supply PPR & Pex Piping Installation

This document defines and covers the methods for installation of Water Supply Piping System at a construction project site, in compliance with the approved designs and approved material submittals. Prior to installation of PPR & PEX Water Supply Piping System, the supervisor and foreman will verify and ensure that all the safety requirements have been… Read More: Method Statement for Water Supply PPR & Pex Piping Installation »

Roof Water Proofing Procedure Using Waterproof Membranes

The scope of this procedure comprises the control of waterproof membranes installation and application on flat and inclined substrates. The condition and moisture content of the substrate will be inspected and accepted by the subcontractor before commencement of waterproofing works on site. A meeting will be held with specialist subcontractor to discuss the scope, sequence… Read More: Roof Water Proofing Procedure Using Waterproof Membranes »

Project Environmental Safety Procedure – Job Safety and Environmental Analysis

The purpose of this EHS procedure is to provide a framework for reducing risks to employees and protect them from the work place hazards through the implementation of Job Safety and Environmental Analysis. Scope of work for this hse procedure  covers all construction project activities. Hazard is any condition or practice with the potential for… Read More: Project Environmental Safety Procedure – Job Safety and Environmental Analysis »

Scaffolding Shuttering Formwork Erection, Removal and Dismantling Method Statement

This document summarizes the general details for any kind of scaffolding formwork system as well as traditional wooden forms including Fabrication, Erection, Removal, Inspection and Striking etc. The sequence of activities includes: Tying up reinforcement Concreting Curing De-shuttering Cleaning Stacking This scope of works is for the following reinforced concrete works: Horizontal Elements: slabs, beams,… Read More: Scaffolding Shuttering Formwork Erection, Removal and Dismantling Method Statement »