Drainage Vacuum System Installation and Testing Method Statement

Before start of drainage system piping installation and testing completeness of the related works and systems shall be ensured by physical inspections and interpreting the previously submitted and approved work inspection reports/records. Make sure that all tools/equipment/instruments required are calibrated and having valid certificate. Safe access to work areas shall be provided and shall be… Read More: Drainage Vacuum System Installation and Testing Method Statement »

Chilled Water Pipe Installation & Testing Method of Statement

Below is a brief mechanical HVAC method statement that covers the installation of chilled water CHW piping system. This procedure defines the method used to ensure that the piping installation has been carried out as per contract requirements and best practices. Also it gives details of how the work will be carried out and how… Read More: Chilled Water Pipe Installation & Testing Method of Statement »

Construction Methodology for Building Construction Project Civil Work

The purpose of this construction methodology is to specify the requirements of civil building construction activities including excavation, backfilling, and allied activities complying with the contract documents, project specifications as per the scope of work and approved drawings/documents. This method statement also covers requirements for earthworks associated with trenches for pipelines or service ducts etc.… Read More: Construction Methodology for Building Construction Project Civil Work »

Fire Sprinkler System Installation Method Statement

This mechanical method statement covers the installation of fire sprinkler system piping network. Procedure defines the method used to ensure the installation has been carried out as per contract requirements and best industry practices. The method statement gives details of how the work will be carried out and how the health and safety issues and… Read More: Fire Sprinkler System Installation Method Statement »

Temporary Traffic Management Plan & Method Statement for Construction Project Sites

This method statement describes the overall sequence of the traffic diversions that will be carried out at a construction project site. It also outlines the materials used, machinery and equipment involved for ensuring the works are carried out safely and in compliance with contract requirements. Terms & Definitions Competent Person: For the purpose of the… Read More: Temporary Traffic Management Plan & Method Statement for Construction Project… »

Underground Drainage Piping Installation Method Statement

This Method Statement covers the installation of uPVC and HDPE pipes for use with the underground and substructure drainage piping systems. Procedure defines the method used to ensure the underground drainage pipework installation has been carried out as per technical specifications and best commercial and engineering practices. Roles & Responsibilities Project manager will be overall… Read More: Underground Drainage Piping Installation Method Statement »