Author Archives: Web Master

Underground Drainage Piping Installation Method Statement

This Method Statement covers the installation of uPVC and HDPE pipes for use with the underground and substructure drainage piping systems. Procedure defines the method used to ensure the underground drainage pipework installation has been carried out as per technical specifications and best commercial and engineering practices. Roles & Responsibilities Project manager will be overall… Read More: Underground Drainage Piping Installation Method Statement »

Project HSE Training, Awareness and Competence Procedure

Project safety training for all project personnel is completed on the projects in accordance with the requirements documented in this hse training procedure as identified below. The Management of Health and Safety at work places a duty on every company to: 1. Take into account employees capabilities as regards Health and safety, 2. Provide adequate… Read More: Project HSE Training, Awareness and Competence Procedure »

Mechanical Equipment Inspection Checklists During Construction Project Lifecycle

Below is a comprehensive list of different inspection requirements for receiving storing and installation of different mechanical/HVAC equipment’s. These inspections must be completed throughout the project at its different stages i.e. delivery, storage, installation & pre-commissioning before the functional testing occurs. Delivery Inspections Once the equipment i.e. FCU arrives at the site, usually delivered by… Read More: Mechanical Equipment Inspection Checklists During Construction Project Lifecycle »

Specific Gravity and Water Absorption Aggregate Testing Method

The purpose of this procedure is to determine the specific gravity and water absorption of given sample of aggregates for road works. Specific gravity of an aggregate is considered to be a measure of strength or quality of the material. Stones having low specific gravity are generally weaker than those with higher specific gravity values.… Read More: Specific Gravity and Water Absorption Aggregate Testing Method »

Method Statement for Building Construction Civil Engineering Project

Below is best construction method statement that also covers the quality planning at construction site of civil engineering project. Below is list of activities that are covered in this civil contractor method of statement. Excavation work, including soil excavation, soil disposal, backfill and underground water disposal to ensure quality of foundation work. Formwork, including all… Read More: Method Statement for Building Construction Civil Engineering Project »

Construction Definitions & Terms – Beginning with E and F

Construction Terms Beginning With Letter: E EarnestMoney- A sum paid to the seller to show that a potential purchaser is serious about buying. Earthquake Strap- A metal strap used to secure gas hot water heaters to the framing or foundation of a house. Intended to reduce the chances of having the water heater fall over… Read More: Construction Definitions & Terms – Beginning with E and F »