Author Archives: Web Master

Method Statement for Drainage & Sewage Works

The purpose of this plumbing method statement is to define the procedure for the preparation and construction of gravity sewer lines with GRP pipes with associated inspection chambers, manholes in accordance with the requirements specified in the relevant specifications 0considering safety and quality of the work activities. Scope of work may cover any length of… Read More: Method Statement for Drainage & Sewage Works »

Hydrotest Pipe Pressure Testing Procedure

This mechanical method statement section applies to the hydrostatic testing of new fabricated and installed stainless steel SS pipelines associated with a construction or pipeline project. After completion and approval of all welding, radiography and NDT requirements/ activities the piping system shall be hydrostatically pressure tested. The site supervisor shall obtain relevant safety permits to… Read More: Hydrotest Pipe Pressure Testing Procedure »

Construction Noise Control Measures, Plan and Procedure

This health and safety instruction provides information on the noise hazards and control measures regarding noise in the workplace with the view to prevent industrial hearing loss. The safety procedure is applicable for all kind of projects. Additional control measures may be required depending on project and country local legal occupational health and safety requirements… Read More: Construction Noise Control Measures, Plan and Procedure »

Road Maintenance Method Statement Including Cracks Potholes Patches Edge Breaks

Contractor will carry out the road maintenance and construction works in compliance with the technical specification and engineer’s instructions. With the direction and instruction of the client/ consulting engineer, at the designated areas, the motor graders and excavators are used to clear, remove, and dispose all vegetation, silt and grubbing roots, down timber and other… Read More: Road Maintenance Method Statement Including Cracks Potholes Patches Edge Breaks »

Method Statement for Plastering Works

Below is a standard method statement for plastering works, which must be followed for any kind of project. Any suitable location can be designated by the client/consultant for the construction of Mock Up, prior to start the actual work in order to obtain final approval. Approved mock-up may remain as part of the completed works.… Read More: Method Statement for Plastering Works »

Method Statement for Tiling Work Installation of Ceramic, Porcelain & Agglomerate Tiles

Below is step wise civil work method statement for tile fixing and installation of ceramic, porcelain & agglomerate tiling works for any kind of building projects. Following is list of necessary equipment’s and tools that are mandatory for the tiling work: Drum mixer Grinder/saw or wet diamond table masonry cutter Aluminum straight edge Trowel Plumb… Read More: Method Statement for Tiling Work Installation of Ceramic, Porcelain &… »